Skip to main content

Final Safety Evaluations

Final Safety Evaluations for Calvert Cliffs, Unit 3 Application

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that Calvert Cliffs 3 Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC submitted for Calvert Cliffs, Unit 3.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

ChapterDescriptionDate
1Introduction and General Description of PlantTBD
2Site CharacteristicsTBD
3Design of Structures, Components, Equipment, and SystemsTBD
4ReactorTBD
5Reactor Coolant System and Connected SystemsTBD
6Engineered Safety FeaturesTBD
7Instrumentation and Controls SystemsTBD
8Electric PowerTBD
9Auxiliary SystemsTBD
10Steam and Power Conversion SystemTBD
11Radioactive Waste ManagementTBD
12Radiation ProtectionTBD
13Conduct of OperationsTBD
14Initial Test ProgramTBD
15Accident and AnalysisTBD
16Technical SpecificationsTBD
17Quality AssuranceTBD
18Human Factors EngineeringTBD
19Response to Severe Accident Policy StatementTBD