This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
A recommendation can have a status of:
- Open:
- Unresolved – The auditee's initial response to the report's recommendations and/or subsequent OIG analysis has not yet been completed or the proposed corrective action is not responsive.
- Resolved – The auditee's proposed corrective action is responsive, but not yet completed.
- Closed: Corrective action is responsive and considered by OIG as completed or auditee's rationale for taking no action is considered by OIG as acceptable.
| Report Title | Date | Number |
|---|---|---|
| Special Inquiry: NRC's Oversight of the Quality Assurance Programs Related to the Manufacture of Holtec International Dry Cask Storage Systems | 07/27/2004 | OIG-03-03S |
|
Event Inquiry: NRC's Oversight of Davis-Besse Boric Acid Leakage and Corrosion During the April 2000 Refueling Outage |
10/17/2003 | OIG-03-02S |
| Event Inquiry Regarding NRC Enforcement of Regulatory Requirements and Commitments at Indian Point, Unit 2 | 04/30/2003 | OIG-01-01S |
| Event Inquiry Regarding NRC's Regulation of Davis-Besse Regarding Damage to the Reactor Vessel Head | 12/30/2002 | OIG-02-03S |
| Event Inquiry Regarding NRC's Regulatory Oversight Over the Control of Special Nuclear Material at Millstone Unit 1 | 10/31/2002 | OIG-01-03S |
| NRC's Response to the February 15, 2000 Steam Generator Tube Rupture at Indian Point Unit 2 Power Plant | 08/29/2000 | OIG-00-03S |
| Special Evaluation of the Role and Structure of NRC's Commission (See also: Commission Response to this Evaluation) | 12/23/1999 | OIG-99E-09 |
| NRC Staff's Handling of Harassment and Intimidation (H&I) Complaints at Millstone | 12/31/1998 | OIG-99-01S |
| Little Harbor Consultants' Involvement in Resolution of Employee Complaints at Millstone Power Station | 11/27/1998 | OIG-98-03S |
| Allegation of Sunshine Act and Ex Parte Communication Violations by NRC Commissioners | 05/27/1998 | OIG-98-02S |
| Public's Concerns with NRC Report of Independent Safety Assessment (ISA) at Maine Yankee | 01/26/1998 | OIG-97-03S |
| Public's Concerns with Millstone Independent Corrective Action/Verification Program (ICAVP) | 01/13/1998 | OIG-97-05S |
| State of Maine Involvement in the NRC Independent Safety Assessment of Maine Yankee Atomic Power Station | 10/17/1997 | OIG-97-02S |
| NRC Inspection of Unauthorized Access Incident at Millstone Nuclear Power Station | 09/15/1997 | OIG-97-07S |
| NRC Staff's Actions Regarding MIRG Interview Transcripts and Its Handling of an Allegation | 04/02/1997 | OIG-97-01S |
| NRC Staff Actions to Address CU-29 Isolation Valve Issue | 09/03/1996 | OIG-96-06S |
| NRC Handling of Issues Related to Refueling Operations at Millstone Unit 1 | 07/23/1996 | OIG-96-05S |
| NRC Staff Actions to Address Northeast Utilities System (NU) 1991 Self-Assessments | 05/31/1996 | OIG-96-02S |
| NRC Staff's Actions Related to Regulation at Maine Yankee | 05/08/1996 | OIG-96-04S |
| Implementation of Recommendations to Improve NRC's Program for Protecting Allegers Against Retaliation | 03/05/1996 | OIG-96-01S |
| NRC Failure to Adequately Regulate - Millstone Unit 1 | 12/21/1995 | OIG-95-077I |