Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

Power Reactor Status Report for October 02, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 Coastdown To Refueling Outage
Beaver Valley 2 98 Unplanned Closure of Moisture Separator Steam Valve
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 0 2022-09-26 Refueling Outage
Ginna 100
Hope Creek 1 0 2022-09-28 Refueling Outage
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 89 Coastdown To Refueling Outage *
Peach Bottom 3 100
Salem 1 71 Turbine Valve Testing and Maintenance on Main Bus Duct Cooling System *
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 2022-09-29 Commencing Startup *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 2022-10-01 Refueling Outage
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0 2022-09-14 Refueling Outage;
Farley 1 0 2022-09-18 Refueling Outage
Farley 2 100
Harris 1 92 Coastdown To Refueling Outage *
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 2022-09-21 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 2022-09-25 Maintenance Outage *
Saint Lucie 1 0 2022-09-03 Refueling Outage *
Saint Lucie 2 100
Sequoyah 1 98 Coastdown To Refueling Outage *
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 80 Coastdown To Refueling Outage
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 0 2022-10-01 Refueling Outage *
Davis-Besse 100
Dresden 2 100
Dresden 3 94 Coastdown To Refueling Outage *
Fermi 2 100
LaSalle 1 100
LaSalle 2 80 Increasing Power *
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 91 Coastdown To Refueling Outage *
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 73 Coastdown To Refueling Outage
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2022-10-01 Refueling Outage *
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 97 Coastdown To Refueling Outage *
River Bend Station 1 100 *
South Texas 1 100
South Texas 2 93 Coastdown To Refueling Outage *
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.