Power Reactor Status Report for September 29, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 Coastdown To Refueling Outage *
Beaver Valley 2 100
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100
FitzPatrick 0 2022-09-26 Refueling Outage
Ginna 100
Hope Creek 1 0 2022-09-28 Refueling Outage *
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 91 Coastdown To Refueling Outage
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 2022-09-29 Maintenance Outage to address Elevated Drywell Leakage *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 38 Recirc Pump 1B malfunctioning *
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0 2022-09-14 Refueling Outage;
Farley 1 0 2022-09-18 Refueling Outage *
Farley 2 100 *
Harris 1 94 Coastdown To Refueling Outage
Hatch 1 100 Conservative Ops Due to Hurricane IAN *
Hatch 2 100 Conservative Ops Due to Hurricane IAN *
McGuire 1 100
McGuire 2 100
North Anna 1 0 2022-09-21 Refueling Outage *
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 2022-09-25 Maintenance Outage
Saint Lucie 1 0 2022-09-03 Refueling Outage *
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 Conservative Operations Order beginning 9/30/22 at 0100 due to Hurricane Ian
Vogtle 2 100 Conservative Operations Order beginning 9/30/22 at 0100 due to Hurricane Ian
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 82 Coastdown To Refueling Outage *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 60 Coastdown To Refueling Outage *
Davis-Besse 100
Dresden 2 100
Dresden 3 96 Coastdown To Refueling Outage
Fermi 2 100
LaSalle 1 100
LaSalle 2 0 2022-09-26 Manual Trip See EN#56120 *
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 93 Coastdown To Refueling Outage *
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 75 Coastdown To Refueling Outage *
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 71 Coastdown To Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 95 Coastdown To Refueling Outage *
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.