Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

Power Reactor Status Report for September 28, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 99 Reduced Power for Economic Dispatch
Calvert Cliffs 2 100
FitzPatrick 0 2022-09-26 Refueling Outage
Ginna 100
Hope Creek 1 83 Coastdown To Refueling Outage *
Limerick 1 100 *
Limerick 2 100 *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 91 Coastdown To Refueling Outage *
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 *
Susquehanna 2 100 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 40 Recirc Pump 1B malfunctioning *
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0 2022-09-14 Refueling Outage;
Farley 1 0 2022-09-18 Refueling Outage; Conservative Operations Order beginning 9/29/22 at 0000 due to Hurricane Ian
Farley 2 100 Conservative Operations Order beginning 9/29/22 at 0000 due to Hurricane Ian
Harris 1 94 Coastdown To Refueling Outage *
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 2022-09-21 Refueling Outage *
North Anna 2 100 *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 2022-09-25 Maintenance Outage
Saint Lucie 1 0 2022-09-03 Refueling Outage
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100 *
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 Conservative Operations Order beginning 9/30/22 at 0100 due to Hurricane Ian *
Vogtle 2 100 Conservative Operations Order beginning 9/30/22 at 0100 due to Hurricane Ian *
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 84 Coastdown To Refueling Outage *
Braidwood 2 100 *
Byron 1 100 *
Byron 2 100 *
Clinton 100 *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100 *
Dresden 2 100
Dresden 3 96 Coastdown To Refueling Outage *
Fermi 2 100 *
LaSalle 1 100 *
LaSalle 2 0 2022-09-26 Manual Trip See EN#56120 *
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 94 Coastdown To Refueling Outage *
Prairie Island 2 100 *
Quad Cities 1 100 *
Quad Cities 2 100 *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 76 Coastdown To Refueling Outage
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 71 Coastdown To Refueling Outage *
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 96 Coastdown To Refueling Outage
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.