Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

Power Reactor Status Report for September 19, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100 Hot Weather Alert
Calvert Cliffs 2 10 Hot Weather Alert; Awaiting Parts for Turbine Maintenance *
FitzPatrick 79 Coastdown To Refueling Outage
Ginna 100
Hope Creek 1 87 Coastdown To Refueling Outage
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 64 Holding Power for Feedwater Issues *
Peach Bottom 2 95 Coastdown To Refueling Outage
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 *
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 87 Coastdown To Refueling Outage
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100 Yellow Grid Condition *
Catawba 2 0 2022-09-14 Refueling Outage; Yellow Grid Condition *
Farley 1 0 2022-09-18 Refueling Outage *
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100 Hot Weather Alert *
North Anna 2 50 Hot Weather Alert; Increasing Power *
Oconee 1 100 Yellow Hands-Off Grid Condition *
Oconee 2 100 Yellow Hands-Off Grid Condition *
Oconee 3 100 Yellow Hands-Off Grid Condition *
Robinson 2 100
Saint Lucie 1 0 2022-09-03 Refueling Outage
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100 Hot Weather Alert *
Surry 2 100 Hot Weather Alert *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 91 Coastdown To Refueling Outage *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100 *
LaSalle 2 100
Monticello 100
Perry 1 76 Reduced Power For Rod Pattern Adjustment *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100 *
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 80 Coastdown To Refueling Outage *
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 74 Coastdown To Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100 *
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.