Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

Power Reactor Status Report for January 29, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 Cold Weather Alert *
Beaver Valley 2 100 Cold Weather Alert *
Calvert Cliffs 1 99 Coastdown To Refueling Outage, Conservative Operations due to Cold Weather *
Calvert Cliffs 2 100 Conservative Operations due to Cold Weather *
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 99 Increasing Power *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 99 Coastdown To Refueling Outage
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 Conservative Operations due to Cold Weather *
Susquehanna 1 94 Coastdown To Refueling Outage, Flow Limited *
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 *
Browns Ferry 2 100
Browns Ferry 3 86 Coastdown To Refueling Outage
Brunswick 1 96 Flow limited until rod pattern adjustment *
Brunswick 2 0 2022-01-28 Shutdown for Unplanned Maintenance *
Catawba 1 100 Troubleshooting Feedwater Isolation Valve Issue *
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 93 Coastdown To Refueling Outage
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 98 Holding power due to feed regulating valve issue
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100 Cold Weather Alert *
Surry 2 100 Cold Weather Alert *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 95 Holding power due to S/G conditions

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100 Cold Weather Alert *
Braidwood 2 100 Cold Weather Alert *
Byron 1 100
Byron 2 100
Clinton 98 100% Electrical Capability *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100 Cold Weather Alert *
Dresden 3 100 Cold Weather Alert *
Fermi 2 57 Coastdown To Refueling Outage
LaSalle 1 93 Coastdown to Refueling Outage *
LaSalle 2 100
Monticello 100 *
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 92 Increasing Power *
Palo Verde 1 100
Palo Verde 2 0 2022-01-25 Shutdown For Maintenance
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.