Skip to main content

Power Reactor Status Report for October 10, 2016

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 0 2016-09-23 REFUELING OUTAGE *
Beaver Valley 2 100 *
Calvert Cliffs 1 100 MINIMUM GENERATION ADVISORY *
Calvert Cliffs 2 100 MINIMUM GENERATION ADVISORY *
FitzPatrick 77 COASTDOWN TO REFUELING OUTAGE *
Ginna 100
Hope Creek 1 100 *
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 0 2016-09-18 START-UP MODE WITH ALL CONTROL RODS STILL INSERTED *
Peach Bottom 2 96 100 MVAR LIMIT FOR TURBINE BEARING VIBRATION COASTDOWN TO REFUELING OUTAGE
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 *
Susquehanna 2 100 *
Three Mile Island 1 100 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 2016-09-30 REFUELING OUTAGE
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 53 REDUCED POWER BASED ON GRID CONDITIONS *
Brunswick 2 85 REDUCED POWER BASED ON GRID CONDITIONS *
Catawba 1 100
Catawba 2 50 INCREASING POWER TO 100% *
Farley 1 0 2016-10-01 REFUELING OUTAGE
Farley 2 100
Harris 1 0 2016-10-09 REFUELING OUTAGE *
Hatch 1 100 *
Hatch 2 100 *
McGuire 1 100
McGuire 2 100
North Anna 1 0 2016-09-10 REFUELING OUTAGE
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 2016-10-08 MAKING PREPARATIONS FOR REACTOR START-UP *
Saint Lucie 1 0 2016-09-25 REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS
Saint Lucie 2 0 2016-10-06 FORCED OUTAGE
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 0 2016-10-08 FORCED OUTAGE - AUTOMATIC RX TRIP ON GENERATOR LOCKOUT - SEE EN #52292 *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 *
Vogtle 2 100 *
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 0 2016-09-25 REFUELING OUTAGE
Braidwood 2 100
Byron 1 71 LOAD FOLLOWING *
Byron 2 71 LOAD FOLLOWING *
Clinton 99 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100 *
D.C. Cook 2 0 2016-10-05 REFUELING OUTAGE *
Davis-Besse 100 *
Dresden 2 100
Dresden 3 81 COASTDOWN TO REFUELING OUTAGE
Duane Arnold 0 2016-10-03 REFUELING OUTAGE
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 58 REDUCED POWER FOR MAINTENANCE ON FEED PUMP *
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 86 LOAD FOLLOWING *
Quad Cities 2 100 *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2016-09-23 REFUELING OUTAGE
Arkansas Nuclear 2 0 2016-09-28 FORCED OUTAGE - RED TRAIN EDG REPAIRS IN PROGRESS
Callaway 100
Columbia Generating Station 100 *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2016-09-24 REFUELING OUTAGE
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 89 COASTDOWN TO REFUELING OUTAGE *
Grand Gulf 1 0 2016-09-08 FORCED OUTAGE
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 2016-10-07 REFUELING OUTAGE
River Bend 1 100
South Texas 1 100
South Texas 2 0 2016-10-08 REFUELING OUTAGE *
Waterford 3 100
Wolf Creek 1 0 2016-09-02 REFUELING OUTAGE

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.