Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100 *
FitzPatrick 100
Ginna 100
Hope Creek 1 100 *
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2015-11-10 REACTOR COOLANT PUMP OIL LEAK REPAIRED PREPARING FOR PLANT STARTUP *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100 MAINTAIN < 100 MVARS ON UNIT 2
Peach Bottom 3 91 EPU TESTING HOLD
Pilgrim 1 100
Salem 1 100 *
Salem 2 0 2015-10-22 REFUELING OUTAGE *
Seabrook 1 0 2015-09-30 REFUELING OUTAGE PREPARE FOR STARTUP
Susquehanna 1 98 *
Susquehanna 2 100 *
Three Mile Island 1 0 2015-10-29 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 15 GENERATOR NOT ONLINE STARTUP IN PROGRESS *
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 0 2015-11-07 PLANT HEAT UP IN PROGRESS *
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 20 STARTUP IN PROGRESS PREPARING TO SYNC TO THE GRID *
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 80 COASTDOWN TO REFUELING OUTAGE
Summer 0 2015-10-02 REFUELING OUTAGE
Surry 1 0 2015-10-13 FORCED OUTAGE
Surry 2 0 2015-10-18 REFUELING OUTAGE
Turkey Point 3 0 2015-10-18 REFUELING OUTAGE *
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 0 2015-11-06 HEAT UP IN PROGRESS *
Watts Bar 2 0 OPERATING LICENSE ISSUED 10/22/15 - AWAITING INITIAL CORE LOAD

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 73 LOAD DROP PER DISPATCHER ORDER *
Byron 2 72 LOAD DROP PER DISPATCHER ORDER *
Clinton 99 100% ELECTRICAL GENERATION
D.C. Cook 1 100 *
D.C. Cook 2 96 FW HEATER TUBE LEAK *
Davis-Besse 100 *
Dresden 2 0 2015-11-01 REFUELING OUTAGE
Dresden 3 100
Duane Arnold 100
Fermi 2 0 2015-09-13 REFUELING OUTAGE
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 0 2015-10-16 REFUELING OUTAGE
Quad Cities 1 87 LOAD DROP PER DISPATCHER ORDER *
Quad Cities 2 87 LOAD DROP PER DISPATCHER ORDER *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2015-09-20 MAKING PREPARATIONS FOR STARTUP *
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 6 INCREASING POWER *
Cooper 100
Diablo Canyon 1 93 HOLDING POWER FOR POWER ASCENSION PLATEAU *
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 99 MAXIMUM RECIRC FLOW
Palo Verde 1 100
Palo Verde 2 0 2015-10-09 REFUELING OUTAGE
Palo Verde 3 100
River Bend 1 100
South Texas 1 0 2015-10-17 REFUELING OUTAGE
South Texas 2 100
Waterford 3 0 2015-10-25 REFUELING OUTAGE
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.