Skip to main content

Power Reactor Status Report for May 26, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100 *
Calvert Cliffs 1 100 HIGH SYSTEM VOLTAGE ACTION *
Calvert Cliffs 2 100 HIGH SYSTEM VOLTAGE ACTION *
FitzPatrick 100
Ginna 48 CHEMISTRY HOLD *
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100 *
Millstone 2 0 2014-05-25 AUTOMATIC REACTOR TRIP ON LOSS OF OFFSITE POWER. SEE EN #50142. *
Millstone 3 0 2014-05-25 AUTOMATIC REACTOR TRIP ON LOSS OF OFFSITE POWER. SEE EN #50141. *
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 0 2014-04-12 REFUELING OUTAGE
Seabrook 1 100
Susquehanna 1 0 2014-04-12 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *
Susquehanna 2 100 HIGH SYSTEM VOLTAGE ACTION *
Three Mile Island 1 100 HIGH SYSTEM VOLTAGE ACTION
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 2014-05-06 REFUELING OUTAGE
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2014-05-11 REFUELING OUTAGE
Summer 0 2014-04-04 REFUELING OUTAGE *
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 0 2014-05-25 AUTOMATIC REACTOR TRIP ON TURBINE TRIP DUE TO LOSS OF CONDENSER VACUUM. SEE EN #50140. *
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 79 INCREASING POWER *
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100 *
Dresden 3 100
Duane Arnold 93 INCREASING POWER FOLLOWING LOAD LINE ADJUSTMENT *
Fermi 2 100
La Salle 1 100
La Salle 2 100 *
Monticello 88 ENGINEERING HOLD FOR EPU TESTING
Palisades 100
Perry 1 95 HOLDING POWER WHILE RESOLVING FW HEATER ISSUES
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 72 HOLDING POWER FOR GRID STABILIZATION
Arkansas Nuclear 2 0 2014-04-27 REFUELING OUTAGE
Callaway 100
Columbia Generating Station 65 REDUCED POWER FOR ECONOMIC DISPATCH
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
South Texas 1 12 PLANT STARTUP HOLDING FOR TESTING *
South Texas 2 100
Waterford 3 98 INCREASING POWER *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.