Power Reactor Status Report for May 07, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2014-04-18 CORE RELOAD COMPLETE *
Calvert Cliffs 1 100 HIGH SYSTEM VOLTAGE ACTION
Calvert Cliffs 2 100 HIGH SYSTEM VOLTAGE ACTION
FitzPatrick 95 REDUCED POWER FOR ROD PATTERN ADJUSTMENT *
Ginna 0 2014-04-27 DEFUELED
Hope Creek 1 100 HIGH SYSTEM VOLTAGE ACTION
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2014-04-05 REFUELING OUTAGE
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 98 GENERATION LIMITED BY OFFSITE LINE OUTAGE
Salem 2 0 2014-04-12 REFUELING OUTAGE
Seabrook 1 100
Susquehanna 1 0 2014-04-12 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION
Susquehanna 2 100 HIGH SYSTEM VOLTAGE ACTION
Three Mile Island 1 100 HIGH SYSTEM VOLTAGE ACTION
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2014-05-06 REACTOR SCRAM (SEE EN# 50090) *
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 2014-05-06 REFUELING OUTAGE *
Catawba 2 100 *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2014-04-14 REFUELING OUTAGE
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 79 COASTDOWN TO REFUELING OUTAGE
Summer 0 2014-04-04 DEFUELED
Surry 1 100
Surry 2 0 2014-04-20 DEFUELED
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 99 CONDENSER BACKPRESSURE *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 0 2014-05-02 REFUELING OUTAGE
Byron 1 100
Byron 2 100
Clinton 98 100% ELECTRICAL CAPABILITY *
D.C. Cook 1 100 HIGH SYSTEM VOLTAGE ACTION
D.C. Cook 2 100 HIGH SYSTEM VOLTAGE ACTION
Davis-Besse 7 INCREASING POWER *
Dresden 2 60 INCREASING POWER *
Dresden 3 100
Duane Arnold 100
Fermi 2 100
La Salle 1 100
La Salle 2 20 INCREASING POWER *
Monticello 89 ENGINEERING HOLD FOR EPU TESTING *
Palisades 100
Perry 1 100 HIGH SYSTEM VOLTAGE ACTION *
Point Beach 1 100
Point Beach 2 97 PLANT TESTING
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 12 HOLDING POWER FOR TURBINE ROLL PREPARATIONS *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 72 HOLDING POWER FOR GRID STABILIZATION
Arkansas Nuclear 2 0 2014-04-27 FORCED OUTAGE
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 12 OFFLINE FOR MAIN TRANSFORMER REPAIR
Palo Verde 2 93 INCREASING POWER *
Palo Verde 3 100
River Bend 1 100
South Texas 1 0 2014-03-15 REFUELING OUTAGE
South Texas 2 100
Waterford 3 0 2014-04-12 REFUELING OUTAGE
Wolf Creek 1 0 2014-03-07 PLANT HEATUP IN PROGRESS

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.