Skip to main content

Power Reactor Status Report for March 01, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 *
Beaver Valley 2 100 *
Calvert Cliffs 1 0 2014-02-16 REFUELING OUTAGE *
Calvert Cliffs 2 100
FitzPatrick 50 REPAIRING TUBE IN CONDENSER WATER BOX *
Ginna 100
Hope Creek 1 100
Indian Point 2 0 2014-02-23 REFUELING OUTAGE LINE 95891 OOS FOR SCHEDULED MAINTENANCE *
Indian Point 3 100 LINES 96951 AND 96952 RESTRICTED DUE TO UNIT 2 OUTAGE. LINE 95891 OOS FOR UNIT 2 OUTAGE.
Limerick 1 100
Limerick 2 100
Millstone 2 100 *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100 *
Peach Bottom 2 40 LOAD DROP FOR ROD SEQUENCE EXCHANGE *
Peach Bottom 3 100 JUMPERS INSTALLED AROUND MAIN GENERATOR DISCONNECT *
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 99 100% ELECTRICAL CAPABILITY *
Susquehanna 2 1 SHUTDOWN IN PROGRESS FOR PLANNED TURBINE MAINTENANCE *
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2014-02-14 REFUELING OUTAGE
Brunswick 1 0 2014-02-28 ENTERING REFUELING OUTAGE *
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 0 2014-02-17 REFUELING OUTAGE
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 99 *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 92 REPAIRING HEATER DRAIN PUMP DISCHARGE VALVE *
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100 *
Braidwood 2 100 *
Byron 1 100
Byron 2 100
Clinton 98 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100 *
D.C. Cook 2 100 *
Davis-Besse 0 2014-01-31 REFUELING OUTAGE COLD WEATHER ALERT
Dresden 2 100
Dresden 3 100
Duane Arnold 100
Fermi 2 0 2014-02-10 REFUELING OUTAGE
La Salle 1 10 NOT SYNCED TO GRID. HOLDING POWER FOR GENERATOR VIBRATION ISSUES. *
La Salle 2 100 *
Monticello 91 ENGINEERING HOLD FOR EPU TESTING
Palisades 0 2014-01-19 REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS
Perry 1 100 COLD WEATHER ALERT
Point Beach 1 65 REDUCED POWER FOR PLANNED MAINTENANCE *
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 94 COASTDOWN TO REFUELING OUTAGE *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 0 2014-02-08 REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS *
Diablo Canyon 2 25 REDUCED POWER DUE TO STORM SWELL *
Fort Calhoun 100
Grand Gulf 1 0 2014-02-09 REFUELING OUTAGE
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.