Skip to main content

Power Reactor Status Report for November 03, 2012

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 29 INCREASING POWER *
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100 *
FitzPatrick 100
Ginna 0 2012-10-21 REFUELING OUTAGE
Hope Creek 1 100 *
Indian Point 2 100 138 KV FEEDER (LINE 13332) OOS *
Indian Point 3 100 138 KV FEEDER (LINE 13332) OOS AND W97 OUTPUT FEEDER OOS *
Limerick 1 100 *
Limerick 2 100 *
Millstone 2 0 2012-10-06 DEFUELED
Millstone 3 100
Nine Mile Point 1 20 PREPARING TO CONNECT TO GRID *
Nine Mile Point 2 100
Oyster Creek 0 2012-10-21 REFUELING OUTAGE
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 18 HOLDING POWER DUE TO VOLTAGE REGULATOR ISSUE *
Salem 2 0 2012-10-14 DEFUELED
Seabrook 1 100 *
Susquehanna 1 0 2012-10-20 TURBINE BLADE INSPECTION *
Susquehanna 2 71 HOLDING POWER DUE TO LINE CONFIGURATION LIMIT *
Three Mile Island 1 100 *
Vermont Yankee 100 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 2012-10-19 REFUELING OUTAGE
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 98 REDUCED POWER FOR SURVEILLANCE TESTING *
Catawba 2 100
Crystal River 3 0 2009-09-25 DEFUELED - CONT.TENSIONING ON HOLD
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 83 REDUCING POWER TO 63% FOR TURBINE VALVE TESTING *
McGuire 1 100
McGuire 2 0 2012-09-15 HOLDING HEATUP FOR EQUIPMENT MAINTENACE *
North Anna 1 100
North Anna 2 99
Oconee 1 0 2012-10-26 REFUELING OUTAGE
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2012-08-05 REFUELING OUTAGE, 240 PSI IN RCS
Sequoyah 1 100
Sequoyah 2 0 2012-10-14 DEFUELED
Summer 0 2012-10-12 DEFUELED
Surry 1 100
Surry 2 0 2012-10-31 REFUELING OUTAGE
Turkey Point 3 95 HOLDING POWER FOR EPU TESTING *
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 98 HOLDING FOR INSTRUMENTATION ISSUE *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 0 2012-10-15 REFUELING OUTAGE - CORE RELOAD COMPLETED
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 55 FEED PUMP DAMAGE *
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 86 COASTDOWN TO REFUELING OUTAGE *
Duane Arnold 0 2012-10-05 REFUELING OUTAGE
Fermi 2 68 POWER LIMITED TO 68% DUE TO SOUTH REACTOR FEED PUMP OOS
Kewaunee 100
La Salle 1 100
La Salle 2 80 ROD PATTERN ADJUSTMENTS *
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 0 2012-10-31 REFUELING OUTAGE
Prairie Island 1 0 2012-10-22 REFUELING OUTAGE
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 0 2012-11-01 MANUALLY TRIPPED DUE TO HIGH RCP MOTOR BEARING TEMP - SEE EN#48475 *
Comanche Peak 2 45 ENGINEERING HOLD *
Cooper 0 2012-10-13 REFUELING OUTAGE
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 0 2011-04-09 DEFUELED *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2012-10-05 HEATUP IN PROGRESS
Palo Verde 3 100 *
River Bend 1 100
San Onofre 2 0 2012-01-09 REFUELING OUTAGE
San Onofre 3 0 2012-01-31 FORCED OUTAGE - S/G REPAIR - DEFUELED
South Texas 1 0 2012-10-20 DEFUELED
South Texas 2 100
Waterford 3 0 2012-10-17 DEFUELED
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.