UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Beaver Valley 1 |
100 |
|
|
|
|
| Beaver Valley 2 |
29 |
|
INCREASING POWER |
* |
|
| Calvert Cliffs 1 |
100 |
|
|
* |
|
| Calvert Cliffs 2 |
100 |
|
|
* |
|
| FitzPatrick |
100 |
|
|
|
|
| Ginna |
0 |
2012-10-21 |
REFUELING OUTAGE |
|
|
| Hope Creek 1 |
100 |
|
|
* |
|
| Indian Point 2 |
100 |
|
138 KV FEEDER (LINE 13332) OOS |
* |
|
| Indian Point 3 |
100 |
|
138 KV FEEDER (LINE 13332) OOS AND W97 OUTPUT FEEDER OOS |
* |
|
| Limerick 1 |
100 |
|
|
* |
|
| Limerick 2 |
100 |
|
|
* |
|
| Millstone 2 |
0 |
2012-10-06 |
DEFUELED |
|
|
| Millstone 3 |
100 |
|
|
|
|
| Nine Mile Point 1 |
20 |
|
PREPARING TO CONNECT TO GRID |
* |
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
0 |
2012-10-21 |
REFUELING OUTAGE |
|
|
| Peach Bottom 2 |
100 |
|
|
|
|
| Peach Bottom 3 |
100 |
|
|
|
|
| Pilgrim 1 |
100 |
|
|
|
|
| Salem 1 |
18 |
|
HOLDING POWER DUE TO VOLTAGE REGULATOR ISSUE |
* |
|
| Salem 2 |
0 |
2012-10-14 |
DEFUELED |
|
|
| Seabrook 1 |
100 |
|
|
* |
|
| Susquehanna 1 |
0 |
2012-10-20 |
TURBINE BLADE INSPECTION |
* |
|
| Susquehanna 2 |
71 |
|
HOLDING POWER DUE TO LINE CONFIGURATION LIMIT |
* |
|
| Three Mile Island 1 |
100 |
|
|
* |
|
| Vermont Yankee |
100 |
|
|
* |
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Browns Ferry 1 |
0 |
2012-10-19 |
REFUELING OUTAGE |
|
|
| Browns Ferry 2 |
100 |
|
|
|
|
| Browns Ferry 3 |
100 |
|
|
|
|
| Brunswick 1 |
100 |
|
|
|
|
| Brunswick 2 |
100 |
|
|
|
|
| Catawba 1 |
98 |
|
REDUCED POWER FOR SURVEILLANCE TESTING |
* |
|
| Catawba 2 |
100 |
|
|
|
|
| Crystal River 3 |
0 |
2009-09-25 |
DEFUELED - CONT.TENSIONING ON HOLD |
|
|
| Farley 1 |
100 |
|
|
|
|
| Farley 2 |
100 |
|
|
|
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
100 |
|
|
|
|
| Hatch 2 |
83 |
|
REDUCING POWER TO 63% FOR TURBINE VALVE TESTING |
* |
|
| McGuire 1 |
100 |
|
|
|
|
| McGuire 2 |
0 |
2012-09-15 |
HOLDING HEATUP FOR EQUIPMENT MAINTENACE |
* |
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
99 |
|
|
|
|
| Oconee 1 |
0 |
2012-10-26 |
REFUELING OUTAGE |
|
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
100 |
|
|
|
|
| Robinson 2 |
100 |
|
|
|
|
| Saint Lucie 1 |
100 |
|
|
|
|
| Saint Lucie 2 |
0 |
2012-08-05 |
REFUELING OUTAGE, 240 PSI IN RCS |
|
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
0 |
2012-10-14 |
DEFUELED |
|
|
| Summer |
0 |
2012-10-12 |
DEFUELED |
|
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
0 |
2012-10-31 |
REFUELING OUTAGE |
|
|
| Turkey Point 3 |
95 |
|
HOLDING POWER FOR EPU TESTING |
* |
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
100 |
|
|
|
|
| Vogtle 2 |
100 |
|
|
|
|
| Watts Bar 1 |
98 |
|
HOLDING FOR INSTRUMENTATION ISSUE |
* |
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Braidwood 1 |
100 |
|
|
|
|
| Braidwood 2 |
0 |
2012-10-15 |
REFUELING OUTAGE - CORE RELOAD COMPLETED |
|
|
| Byron 1 |
100 |
|
|
|
|
| Byron 2 |
100 |
|
|
|
|
| Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
| D.C. Cook 1 |
55 |
|
FEED PUMP DAMAGE |
* |
|
| D.C. Cook 2 |
100 |
|
|
|
|
| Davis-Besse |
100 |
|
|
|
|
| Dresden 2 |
100 |
|
|
|
|
| Dresden 3 |
86 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Duane Arnold |
0 |
2012-10-05 |
REFUELING OUTAGE |
|
|
| Fermi 2 |
68 |
|
POWER LIMITED TO 68% DUE TO SOUTH REACTOR FEED PUMP OOS |
|
|
| Kewaunee |
100 |
|
|
|
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
80 |
|
ROD PATTERN ADJUSTMENTS |
* |
|
| Monticello |
100 |
|
|
|
|
| Palisades |
100 |
|
|
|
|
| Perry 1 |
100 |
|
|
|
|
| Point Beach 1 |
100 |
|
|
|
|
| Point Beach 2 |
0 |
2012-10-31 |
REFUELING OUTAGE |
|
|
| Prairie Island 1 |
0 |
2012-10-22 |
REFUELING OUTAGE |
|
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
100 |
|
|
|
|
| Quad Cities 2 |
100 |
|
|
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Arkansas Nuclear 1 |
100 |
|
|
|
|
| Arkansas Nuclear 2 |
100 |
|
|
|
|
| Callaway |
100 |
|
|
|
|
| Columbia Generating Station |
100 |
|
|
|
|
| Comanche Peak 1 |
0 |
2012-11-01 |
MANUALLY TRIPPED DUE TO HIGH RCP MOTOR BEARING TEMP - SEE EN#48475 |
* |
|
| Comanche Peak 2 |
45 |
|
ENGINEERING HOLD |
* |
|
| Cooper |
0 |
2012-10-13 |
REFUELING OUTAGE |
|
|
| Diablo Canyon 1 |
100 |
|
|
|
|
| Diablo Canyon 2 |
100 |
|
|
|
|
| Fort Calhoun |
0 |
2011-04-09 |
DEFUELED |
* |
|
| Grand Gulf 1 |
100 |
|
|
|
|
| Palo Verde 1 |
100 |
|
|
|
|
| Palo Verde 2 |
0 |
2012-10-05 |
HEATUP IN PROGRESS |
|
|
| Palo Verde 3 |
100 |
|
|
* |
|
| River Bend 1 |
100 |
|
|
|
|
| San Onofre 2 |
0 |
2012-01-09 |
REFUELING OUTAGE |
|
|
| San Onofre 3 |
0 |
2012-01-31 |
FORCED OUTAGE - S/G REPAIR - DEFUELED |
|
|
| South Texas 1 |
0 |
2012-10-20 |
DEFUELED |
|
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
0 |
2012-10-17 |
DEFUELED |
|
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.