Power Reactor Status Report for April 28, 2012

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 0 2012-04-08 REFUELING OUTAGE - CORE OFFLOAD COMPLETE HIGH VOLTAGE SYSTEM ALERT
Beaver Valley 2 100 HIGH VOLTAGE SYSTEM ALERT
Calvert Cliffs 1 100 HIGH SYSTEM VOLTAGE ACTION
Calvert Cliffs 2 100 HIGH SYSTEM VOLTAGE ACTION *
FitzPatrick 100
Ginna 100
Hope Creek 1 0 2012-04-13 REFUELING OUTAGE HIGH VOLTAGE SYSTEM ALERT
Indian Point 2 100 138KV FEEDER #96951 OOS FOR PREVENTATIVE MAINTENANCE
Indian Point 3 100 138KV FEEDER #96951 OOS FOR PREVENTATIVE MAINTENANCE
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 0 2012-04-08 REFUELING OUTAGE
Oyster Creek 80 ROD SEQUENCE EXCHANGE *
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100 MINIMUM GRID EMERGENCY *
Salem 1 100 *
Salem 2 100
Seabrook 1 85 POWER LIMITED TO 85% BASED ON GENERATOR STATOR COOLING DELTA T LIMIT MINIMUM GENERATION ALERT *
Susquehanna 1 0 2012-03-31 REFUELING OUTAGE HIGH VOLTAGE SYSTEM ACTION
Susquehanna 2 100 HIGH VOLTAGE SYSTEM ACTION
Three Mile Island 1 100 HIGH VOLTAGE SYSTEM ACTION
Vermont Yankee 94 INCREASING POWER *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2012-04-07 REFUELING OUTAGE
Brunswick 1 0 2012-02-23 REFUELING OUTAGE
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2009-09-25 DEFUELED - CONTAINMENT TENSIONING ON HOLD
Farley 1 59 INCREASING POWER *
Farley 2 100
Harris 1 0 2012-04-20 REFUELING OUTAGE
Hatch 1 100
Hatch 2 97 SAFETY RELIEF TAIL PIPE LEAKAGE
McGuire 1 100
McGuire 2 100
North Anna 1 0 2012-03-10 REFUELING OUTAGE - CORE RELOAD COMPLETE
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2012-04-13 DEFUELED
Robinson 2 100
Saint Lucie 1 30 SECONDARY CHEMISTRY HOLD
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 94 TURBINE CONTROL VALVE TESTING *
Surry 1 93 COASTDOWN TO REFUELING OUTAGE *
Surry 2 100
Turkey Point 3 0 2012-02-26 DEFUELED
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 0 2012-04-15 DEFUELED
Braidwood 2 100
Byron 1 98 SLIGHTLY REDUCED POWER FOR FEED FLOW INSTRUMENTATION INVESTIGATION MSRs OFFLINE
Byron 2 100 SLIGHTLY REDUCED POWER FOR FEED FLOW INSTRUMENTATION INVESTIGATION
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100 HIGH VOLTAGE ALERT
D.C. Cook 2 0 2012-03-21 STARTUP IN PROGRESS - REACTOR JUST CRITICAL HIGH VOLTAGE ALERT *
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Duane Arnold 96 INCREASING POWER FOLLOWING A LOAD LINE ADJUSTMENT *
Fermi 2 0 2012-03-25 REFUELING OUTAGE
Kewaunee 0 2012-04-05 REFUELING OUTAGE
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 0 2012-04-08 REFUELING OUTAGE *
Perry 1 60 POWER REDUCED FOR FEEDWATER HEATER REPAIRS *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 0 2012-02-21 REFUELING OUTAGE - CORE RELOADED
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 99 INCREASING POWER FROM TURBINE VALVE TESTING *
Columbia Generating Station 100
Comanche Peak 1 65 REDUCED POWER FOR 1A MAIN FEEDPUMP REPAIR *
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 0 2012-04-22 REFUELING OUTAGE *
Diablo Canyon 2 0 2012-04-25 PREPARING FOR RESTART *
Fort Calhoun 0 2011-04-09 REFUELING OUTAGE
Grand Gulf 1 0 2012-02-19 REFUELING OUTAGE
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 85 REDUCED POWER DUE TO #3 TURBINE CONTROL VALVE CLOSURE - MAKING PLANS FOR REPAIR *
San Onofre 2 0 2012-01-09 REFUELING OUTAGE
San Onofre 3 0 2012-01-31 FORCED OUTAGE - S/G REPAIR
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.