Skip to main content

Power Reactor Status Report for November 22, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 *
Beaver Valley 2 100 *
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100 *
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 0 2011-10-08 EXITING REFUELING OUTAGE; TRIP - SEE EN# 47461. *
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 0 2011-11-17 MAINTENANCE OUTAGE - TS SHUTDOWN LEAKING FEEDWATER CHECK VALVE SEE EN # 47454
Salem 1 19 VOLTAGE REGULATOR TESTING - TURBINE AT 1800 RPM; NOT SYNCED *
Salem 2 100
Seabrook 1 100
Susquehanna 1 99 MAXIMUM GENERATION CAPABILITY *
Susquehanna 2 100 *
Three Mile Island 1 0 2011-10-24 REFUELING OUTAGE *
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE
Browns Ferry 2 100 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE
Browns Ferry 3 100 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE
Brunswick 1 100
Brunswick 2 0 2011-11-15 MAINTENANCE OUTAGE - TENSION REACTOR VESSEL HEAD SEE EN #47444 AND EN #47452
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2009-09-25 DEFUELED; CONTAINMENT TENSIONING ON HOLD
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 7 TURBINE TRIP TESTING IN PROGRESS
Oconee 1 55 REPAIRING 1B FEEDPUMP TURBINE OIL STRAINER
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 65 COASTDOWN TO REFUELING OUTAGE/OUTAGE PREPS; 1A1 CIRC WATER PUMP OOS UNTIL THE OUTAGE
Saint Lucie 2 100
Sequoyah 1 100 *
Sequoyah 2 100 *
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 99 HEATER DRAIN PUMP OUT OF SERVICE *
D.C. Cook 2 100
Davis-Besse 0 2011-09-30 MAINTENANCE OUTAGE - REACTOR VESSEL HEAD REPLACEMENT
Dresden 2 100
Dresden 3 100
Duane Arnold 100
Fermi 2 100
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 0 2011-11-19 SCRAM. SEE EN# 47460. *
Palisades 100
Perry 1 100
Point Beach 1 0 2011-10-02 EXIT REFUELING OUTAGE
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 12 INCREASING POWER; NOT SYNCED *
Arkansas Nuclear 2 100
Callaway 0 2011-10-15 EXITING REFUELING OUTAGE
Columbia Generating Station 100 *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 0 2011-04-09 EXITING REFUELING OUTAGE
Grand Gulf 1 96 2ND STAGE MSR LIMITED TO 96% POWER *
Palo Verde 1 0 2011-10-07 EXITING REFUELING OUTAGE
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 100
San Onofre 3 100
South Texas 1 100
South Texas 2 15 HOLDING FOR SCAFFOLD REMOVAL *
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.