Skip to main content

Power Reactor Status Report for March 13, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2011-03-06 REFUELING OUTAGE
Calvert Cliffs 1 100 HIGH VOLTAGE WARNING
Calvert Cliffs 2 0 2011-02-13 EXITING REFUELING OUTAGE; HIGH GRID VOLTAGE WARNING *
FitzPatrick 100 MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 0 2011-03-08 REFUELING OUTAGE
Limerick 1 100
Limerick 2 95 COASTDOWN TO REFUELING OUTAGE *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 92 COASTDOWN TO REFUELING OUTAGE
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 97 COASTDOWN TO REFUELING OUTAGE *
Salem 1 100 HIGH GRID VOLTAGE WARING *
Salem 2 100 HIGH GRID VOLTAGE WARING *
Seabrook 1 100 CONTINGENCY TO DOWNPOWER TO 1000MWe IN 25 MIN. IF REQUESTED
Susquehanna 1 88 INCREASING POWER HIGH GRID VOLTAGE WARING *
Susquehanna 2 94 100% ELECTRICAL CAPABILITY HIGH GRID VOLTAGE WARING *
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 0 2011-02-25 REFUELING OUTAGE
Browns Ferry 3 100 *
Brunswick 1 100
Brunswick 2 0 2011-03-04 REFUELING OUTAGE
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2009-09-25 MAINTENANCE OUTAGE - CONTAINMENT TENSIONING IN PROGRESS
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 0 2011-02-26 REFUELING OUTAGE
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2011-01-02 REFUELING OUTAGE
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 98 100% ELECTRICAL CAPABILITY
Turkey Point 3 2 STARTUP IN PROGRESS INCREASING POWER *
Turkey Point 4 100
Vogtle 1 0 2011-03-06 REFUELING OUTAGE
Vogtle 2 100
Watts Bar 1 94 COASTDOWN TO REFUELING OUTAGE

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 98 COASTDOWN TO REFUELING OUTAGE *
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 0 2011-03-11 MAINTENANCE SHUTDOWN TO REPAIR MAIN GENERATOR SEALS
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Duane Arnold 93 ROD SEQUENCE EXCHANGE *
Fermi 2 100
Kewaunee 0 2011-02-26 REFUELING OUTAGE *
La Salle 1 100
La Salle 2 100
Monticello 0 2011-03-04 REFUELING OUTAGE
Palisades 100
Perry 1 94 COASTDOWN TO REFUELING OUTAGE *
Point Beach 1 100
Point Beach 2 0 2011-02-28 REFUELING OUTAGE
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2011-02-20 REFUELING IN PROGRESS
Callaway 100
Columbia Generating Station 95 MONTHLY CONTROL ROD EXERCISE *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2011-03-12 REFUELING OUTAGE *
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 96 POWER LIMITED 2ND STAGE MSR OUT OF SERVICE FOR THE ENTIRE CYCLE
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 *
San Onofre 3 99
South Texas 1 100
South Texas 2 100
Waterford 3 85 ELEVATED VIBRATION ON FEEDWATER PUMP *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.