Power Reactor Status Report for November 21, 2010

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100 *
FitzPatrick 55 HOLDING WHILE PERFORMING WORK ON RX FEEDPUMP "A" *
Ginna 100
Hope Creek 1 100 *
Indian Point 2 0 2010-11-07 RX CRITICAL ON TUESDAY 23NOV10 *
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2010-11-19 RX CRITICAL ON DAYSHIFT SUNDAY 21NOV10 *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 0 2010-10-31 REFUELING OUTAGE *
Peach Bottom 2 100
Peach Bottom 3 90 INCREASING POWER *
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 99 GENERATOR LIMIT
Susquehanna 2 94 ONE CONTROL ROD TO BE TESTED FOLLOWING ROD SEQUENCE EXCHANGE *
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 2010-11-06 REFUELING OUTAGE
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100 *
Catawba 1 47 HOLDING TO PLACE FEEDPUMP IN SERVICE FOLLOWING STEAM LEAK REPAIR *
Catawba 2 100
Crystal River 3 0 2009-09-25 CORE RELOAD IN PROGRESS *
Farley 1 60 RAMPING UP AT 0.4 MW/MIN FOLLOWING FLUX MAPPING *
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 73 HOLDING WHILE INVESTIGATING FEEDWATER SWINGS *
Robinson 2 100 *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100 *
Sequoyah 2 100
Summer 100
Surry 1 0 2010-10-23 REFUELING OUTAGE
Surry 2 98 100% ELECTRICAL CAPABILITY
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 0 2010-10-05 DEFUELED
Davis-Besse 100
Dresden 2 100
Dresden 3 0 2010-10-31 REFUELING OUTAGE
Duane Arnold 0 2010-10-23 REFUELING OUTAGE
Fermi 2 0 2010-10-24 REFUELING OUTAGE
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 0 2010-11-17 MAINTENANCE OUTAGE
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 96 CONTROL ROD TESTING *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 54 RECIRCULATION PUMP-B TRIP DIV II EDG OUTAGE *
San Onofre 2 100 SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL
San Onofre 3 0 2010-10-09 DEFUELED - SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL
South Texas 1 100
South Texas 2 0 2010-11-03 MAINTENANCE OUTAGE
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.