Skip to main content

Power Reactor Status Report for November 13, 2010

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 98 REDUCED POWER DUE TO SCOOP APPLICATION ISSUE ON THE "B" RECIRC PUMP - GRID RESTRICTION ON LINE #4 112.8KV POST LOCA *
Ginna 100
Hope Creek 1 49 INCREASING POWER TO 100% *
Indian Point 2 0 2010-11-07 FORCED OUTAGE - 138KV FEEDER #95692 OOS *
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 1 STARTUP IN PROGRESS - RX SUBCRITICAL *
Nine Mile Point 2 100
Oyster Creek 0 2010-10-31 REFUELING OUTAGE
Peach Bottom 2 100 ONE OF THREE STARTUP LINES OOS FOR TRANSFORMER MAINTENANCE
Peach Bottom 3 90 REDUCED POWER DUE TO GASSING ON "3B" MAIN TRANSFORMER - ONE OF THREE STARTUP LINES OOS FOR TRANSFORMER MAINTENANCE *
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 84 REDUCED POWER FOR WATERBOX WORK *
Susquehanna 2 82 INCREASING POWER TO 94% WHICH IS 100% ELECTRICAL CAPABILITY *
Three Mile Island 1 100
Vermont Yankee 95 WILL BE PERFORMING ROD PATTERN ADJUSTMENT THEN INCREASING POWER TO 100% *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 2010-11-06 REFUELING OUTAGE
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2009-09-25 DEFUELED
Farley 1 0 2010-10-10 REFUELING OUTAGE *
Farley 2 99 INCREASING POWER TO 100% *
Harris 1 16 SYNC'ING GENERATOR TO GRID *
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2010-10-22 REFUELING OUTAGE *
Robinson 2 0 2010-10-06 MAINTENANCE OUTAGE *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 0 2010-10-01 REFUELING OUTAGE - HEATUP IN PROGRESS *
Sequoyah 2 100
Summer 100
Surry 1 0 2010-10-23 DEFUELED
Surry 2 98 100% ELECTRICAL CAPABILITY
Turkey Point 3 98 INCREASING POWER TO 100% *
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100 *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100 *
D.C. Cook 2 0 2010-10-05 DEFUELED
Davis-Besse 100
Dresden 2 100
Dresden 3 0 2010-10-31 REFUELING OUTAGE
Duane Arnold 0 2010-10-23 REFUELING OUTAGE
Fermi 2 0 2010-10-24 REFUELING OUTAGE
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 47 REDUCED POWER TO ISOLATE THE 'B' HIGH PRESSURE FEEDWATER HEATER STRING *
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 95 REDUCED POWER FOR REPAIR OF HEATER DRAIN TANK PUMP
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100 72-HR LCO ACTION STATEMENT IN EFFECT FOR AUTOXFMR. RESTORATION IS IN PROGRESS. LCO ENTERED AT 0840 CST ON 11/12/10. *
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 80 INCREASING POWER AFTER TURBINE VALVE TESTING *
Cooper 100
Diablo Canyon 1 2 HOLDING POWER TO RESOLVE AUX FEED ISSUE *
Diablo Canyon 2 100 *
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 62 INCREASING POWER TO 100% *
River Bend 1 100
San Onofre 2 100 SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL
San Onofre 3 0 2010-10-09 DEFUELED - SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL
South Texas 1 100
South Texas 2 0 2010-11-03 MAINTENANCE OUTAGE
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.