Power Reactor Status Report for March 26, 2010

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 95 INCREASING POWER *
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 0 2010-03-10 DEFUELED
Indian Point 3 100 REDUNDANT 138KV FEEDER #95891 OOS FOR MAINTENANCE
Limerick 1 0 2010-03-21 SHUT DOWN FOR REFUELING OUTAGE
Limerick 2 100
Millstone 2 100 *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 90 A FEEDWATER HEATER IS ISOLATED
Salem 2 100
Seabrook 1 100 *
Susquehanna 1 0 2010-03-01 REFUELING OUTAGE
Susquehanna 2 94 100% ELECTRICAL CAPABILITY *
Three Mile Island 1 100
Vermont Yankee 99 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2010-02-27 REFUELING OUTAGE
Brunswick 1 0 2010-02-26 REFUELING OUTAGE
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2009-09-25 DEFUELED
Farley 1 100
Farley 2 99 COASTDOWN TO REFUELING OUTAGE *
Harris 1 100
Hatch 1 88 INCREASING POWER *
Hatch 2 100
McGuire 1 0 2010-03-13 DEFUELED
McGuire 2 100
North Anna 1 100
North Anna 2 0 2010-03-20 REFUELING OUTAGE *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 84 COASTDOWN TO REFUELING OUTAGE *
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 0 2010-03-07 REFUELING OUTAGE *
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 0 2010-03-02 DEFUELED
D.C. Cook 2 100
Davis-Besse 0 2010-02-27 DEFUELED
Dresden 2 100
Dresden 3 100
Duane Arnold 100
Fermi 2 0 2010-03-25 AUTOMATIC REACTOR SHUTDOWN DUE TO MAIN TURBINE TRIP - SEE EN #45789. *
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 97 HOLDING POWER - FEEDWATER HEATER MAINTENANCE IN PROGRESS *
Perry 1 100
Point Beach 1 0 2010-02-28 REFUELING OUTAGE - 345KV LINE "121" OOS FOR MAINTENANCE *
Point Beach 2 100 345KV LINE "121" OOS FOR MAINTENANCE
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 0 2010-03-14 REFUELING OUTAGE

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2010-03-21 REFUELING OUTAGE
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 98 COASTDOWN TO REFUELING OUTAGE
Palo Verde 1 97 HOLDING POWER DUE TO TURBINE FIRST STAGE PRESSURE CONCERN *
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 0 2009-09-26 EXITING REFUELING / MAINTENANCE OUTAGE
San Onofre 3 50 REDUCED POWER FOR FUEL MANAGEMENT
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.