Power Reactor Status Report for November 22, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2009-10-11 REFUELING OUTAGE
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 65 HOLDING POWER TO TROUBLESHOOT MAIN TURBINE ISSUES
Susquehanna 1 94 100% ELECTRICAL CAPABILITY
Susquehanna 2 94 100% ELECTRICAL CAPABILITY *
Three Mile Island 1 0 2009-10-25 DEFUELED
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100 *
Brunswick 2 100
Catawba 1 0 2009-11-06 DEFUELED
Catawba 2 100
Crystal River 3 0 2009-09-25 DEFUELED
Farley 1 100
Farley 2 100
Harris 1 99 INCREASING POWER *
Hatch 1 100
Hatch 2 60 FEEDPUMP MAINTENANCE *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 0 2009-10-09 REFUELING OUTAGE
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2009-10-25 REFUELING OUTAGE *
Summer 0 2009-10-16 REFUELING OUTAGE
Surry 1 100
Surry 2 0 2009-10-31 REFUELING OUTAGE *
Turkey Point 3 100
Turkey Point 4 0 2009-10-25 REFUELING OUTAGE
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 89 INCREASING POWER FOLLOWING ROUTINE PM'S *
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 0 2008-09-20 FORCED OUTAGE - CHANGED TO MODE 4 ON 11/22/09 *
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 0 2009-11-01 REFUELING OUTAGE
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 100 SWITCHYARD WORK SCHEDULED FOR 11/23
Fermi 2 100
Kewaunee 100
La Salle 1 70 REDUCED POWER FOR SCHEDULED SURVEILLANCES *
La Salle 2 100
Monticello 90 INCREASING POWER FOLLOWING ROUTINE SURVEILLANCES *
Palisades 100
Perry 1 100
Point Beach 1 42 CONDENSER WATERBOX CLEANING
Point Beach 2 0 2009-10-14 REFUELING OUTAGE
Prairie Island 1 1 STARTUP IN PROGRESS *
Prairie Island 2 99 INCREASING TO 100% *
Quad Cities 1 77 REDUCED POWER FOR SCRAM TIME TESTING *
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 97 REDUCED POWER FOR CONTROL ROD AND BYPASS VALVE TESTING *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100 *
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 0 2009-10-31 DEFUELED
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2009-10-02 REFUELING OUTAGE
Palo Verde 3 100
River Bend 1 100
San Onofre 2 0 2009-09-26 DEFUELED
San Onofre 3 100 *
South Texas 1 96 INCREASING POWER *
South Texas 2 100
Waterford 3 0 2009-10-19 FUEL RELOAD COMPLETE *
Wolf Creek 1 30 INCREASING POWER *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.