Power Reactor Status Report for December 05, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 0 2008-11-28 PULLING RODS. MAIN TRANSFORMER REPAIRS ONGOING *
Peach Bottom 2 100 SWITCHYARD 500KV LINE #5007 OUTAGE SCHEDULED FOR 12/1 THRU 12/19 - NO IMPACT ON ELECTRICAL REQUIREMENTS FOR SITE
Peach Bottom 3 100 SWITCHYARD 500KV LINE #5007 OUTAGE SCHEDULED FOR 12/1 THRU 12/19 - NO IMPACT ON ELECTRICAL REQUIREMENTS FOR SITE
Pilgrim 1 100 *
Salem 1 100
Salem 2 100
Seabrook 1 100 NOTIFIED BY NEW ENGLAND ISO TO IMPLEMENT CONTINGENCY FOR REDUCING POWER TO LESS THAN 800 MWE, IF NECESSARY, DUE TO SCHEDULED LINE OUTAGE FROM 12/1 TO 12/15.
Susquehanna 1 94 100% ELECTRICAL CAPABILITY
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 42 #1 COOLING TOWER TRANSFORMER OOS INCREASING POWER *
Browns Ferry 2 100 #1 COOLING TOWER TRANSFORMER OOS
Browns Ferry 3 100 #1 COOLING TOWER TRANSFORMER OOS
Brunswick 1 97 INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT *
Brunswick 2 99 AT FLOW LIMIT; ROD PATTERN ADJUSTMENT PLAN FOR WEEKEND IN PROGRESS *
Catawba 1 100
Catawba 2 100
Crystal River 3 52 DOWNPOWER MANUEVER IN PROGRESS TO HOLD AT 48% RX POWER TO AFFECT REPAIRS ON ONE CONDENSATE PUMP AND ONE FEEDPUMP *
Farley 1 100
Farley 2 100 DOWNPOWER MANUEVER IN PROGRESS TO 81 % RX POWER AND HOLDING TO WORK ON A STEAM VALVE ASSOCIATED WITH 2B FEEDPUMP ON DAYSHIFT *
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 0 2008-10-24 EXITING REFUELING OUTAGE
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 88 REDUCED CAPACITY WHILE PERFORMING 345KV PLANNED MAINTENANCE UNTIL 12/15 *
D.C. Cook 1 0 2008-09-20 SEE EN #44507.
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 97 100% ELECTRICAL CAPABILITY
Dresden 3 99 100% ELECTRICAL CAPABILITY
Duane Arnold 97 COASTDOWN TO REFUELING OUTAGE
Fermi 2 100
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2008-10-26 REFUELING OUTAGE - CORE RELOAD IN PROGRESS
Arkansas Nuclear 2 100
Callaway 100 14 DAY LCO - ESSENTIAL SERVICE WATER SYSTEM UNTIL 12/15 *
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 99 HIGH RATE BLOWDOWN *
Palo Verde 2 0 2008-11-21 REPAIRS FOR HYDROGEN LEAK IN MAIN GENERATOR ONGOING
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 STEAM GENERATOR LIMITATIONS
San Onofre 3 0 2008-10-12 EXITING REFUELING OUTAGE
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.