Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100 MAINTAIN MINIMUM MVAR FROM SYSOP *
Indian Point 2 100
Indian Point 3 100 *
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 0 2008-10-11 REFUELING OUTAGE
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 95 COASTDOWN TO REFUELING OUTAGE *
Peach Bottom 2 20 HOLDING - SYNCHED TO GRID *
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 0 2008-10-14 REFUELING OUTAGE - DEFUELED *
Salem 2 100
Seabrook 1 100
Susquehanna 1 94 100% ELECTRICAL CAPABILITY
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 0 2008-10-18 REFUELING OUTAGE

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 ONE COOLING TOWER TRANSFORMER OOS; ONE 500KV FEEDER OOS *
Browns Ferry 2 100 ONE COOLING TOWER TRANSFORMER OOS; ONE 500KV FEEDER OOS *
Browns Ferry 3 100 ONE COOLING TOWER TRANSFORMER OOS; ONE 500KV FEEDER OOS *
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 0 2008-10-19 REFUELING OUTAGE
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 2008-09-20 REFUELING OUTAGE
McGuire 2 100
North Anna 1 100
North Anna 2 0 2008-09-13 MAIN GENERATOR MAINTENANCE
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 2008-09-25 DEFUELED
Saint Lucie 1 0 2008-10-19 REFUELING OUTAGE *
Saint Lucie 2 100
Sequoyah 1 100 "YELLOW" GRID STATUS *
Sequoyah 2 100 "YELLOW" GRID STATUS *
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 24 HOLDING FOR SYNCHRONIZATION *
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 0 2008-10-05 REFUELING OUTAGE
Clinton 97 100% ELECTRICAL CAPABILITY.
D.C. Cook 1 0 2008-09-20 SEE EN #44507.
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 99 100% ELECTRICAL CAPABILITY
Dresden 3 88 COASTDOWN TO REFUELING OUTAGE
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100 SCHEDULED SWITCHYARD MAINTENANCE ON TWO BREAKERS FOR THE BALANCE OF THIS WEEK - NO IMPACT ON FACILITY *
Perry 1 100
Point Beach 1 0 2008-10-04 DEFUELED
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 0 2008-09-19 REFUELING OUTAGE
Quad Cities 1 98 100% ELECTRICAL CAPABILITY
Quad Cities 2 97 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 2008-10-10 DEFUELED *
Columbia Generating Station 100
Comanche Peak 1 100 *
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 1 STARTUP IN PROGRESS - REACTOR SUBCRITICAL *
Palo Verde 1 0 2008-10-04 DEFUELED
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 100% ELECTRICAL CAPABILITY
San Onofre 3 0 2008-10-12 REFUELING OUTAGE
South Texas 1 100
South Texas 2 0 2008-10-04 REFUELING OUTAGE - CORE RELOADED *
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.