Skip to main content

Power Reactor Status Report for August 06, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 98 COASTDOWN TO ROD PATTERN ADJUSTMENT *
Ginna 100
Hope Creek 1 97 100% ELECTRICAL CAPABILITY
Indian Point 2 100
Indian Point 3 100
Limerick 1 100 *
Limerick 2 100 *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 95 #3 STARTUP SOURCE OOS COASTDOWN TO REFUELING OUTAGE
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 94 NEW NSSS LIMIT DUE TO POWER UPRATE
Susquehanna 2 100
Three Mile Island 1 100 *
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 ONE COOLING TOWER TRANSFORMER OOS
Browns Ferry 2 100 ONE COOLING TOWER TRANSFORMER OOS
Browns Ferry 3 100 ONE COOLING TOWER TRANSFORMER OOS
Brunswick 1 100 RELIABILITY ALERT, LVL 0
Brunswick 2 100 RELIABILITY ALERT, LVL 0
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100 RELIABILITY ALERT, LVL 0
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100 HOT WEATHER ALERT
North Anna 2 100 HOT WEATHER ALERT
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100 RELIABILITY ALERT, LVL 0 *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100 HOT WEATHER ALERT
Surry 2 100 HOT WEATHER ALERT
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 98 100% ELECTRICAL CAPABILITY
Watts Bar 1 80 HYDROGEN LEAK IN STATOR - MONITORING STATOR WATER COOLING TEMPERATURE *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100 MAIN TURBINE DIGITAL CONTROL ISSUES
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 100 *
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 0 2008-08-05 MAINTENANCE ON CONTROL ROD DRIVE SEALS *
Perry 1 100 *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 99 100% ELECTRICAL CAPABILITY
Quad Cities 2 98 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100 *
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 98 INSTRUMENT PROBLEM ON FEEDWATER FLOW
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 75 CONTROL ROD TESTING AND ADJUSTMENTS *
San Onofre 2 98 STEAM GENERATOR PRESSURE LIMITATIONS
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.