Power Reactor Status Report for May 16, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2008-04-14 PERFORMING PLANT STARTUP *
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100 115KV LINE (#4) OOS
Ginna 50 REDUCED POWER DUE TO LOSS OF HEATER DRAIN PUMP. REPAIRS IN PROGRESS. *
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 18 INCREASING POWER *
Millstone 3 100
Nine Mile Point 1 100 115 KV LINE 4 OOS DUE TO FAULTS IN FITZPATRICK SWYD. 7-DAY LCO IN EFFECT.
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100 500KV LINE (220-34) OOS FOR MAINTENANCE
Peach Bottom 3 100 500KV LINE (220-34) OOS FOR MAINTENANCE
Pilgrim 1 100
Salem 1 100
Salem 2 18 INCREASING POWER *
Seabrook 1 100
Susquehanna 1 94 100% ELECTRICAL CAPABILITY
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 500 KV TRINITY LINE OOS UNTIL 6/9/08.
Browns Ferry 2 100 500 KV TRINITY LINE OOS UNTIL 6/9/08.
Browns Ferry 3 9 500 KV TRINITY LINE OOS UNTIL 6/9/08. INCREASING POWER *
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 2008-05-03 REFUELING OUTAGE. DEFUELED
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100 *
Hatch 2 99 *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 0 2008-04-11 REFUELING OUTAGE
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2008-05-04 REFUELING OUTAGE. DEFUELED
Summer 0 2008-04-25 REFUELING OUTAGE *
Surry 1 100
Surry 2 0 2008-04-26 REFUELING OUTAGE
Turkey Point 3 100
Turkey Point 4 93 INCREASING POWER *
Vogtle 1 100
Vogtle 2 98 100% ELECTRICAL CAPABILITY
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 0 2008-04-20 REFUELING OUTAGE *
Byron 1 100
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 98 100% ELECTRICAL CAPABILITY
Dresden 3 98 100% ELECTRICAL CAPABILITY *
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 100 *
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 98 HOLDING POWER *
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100 345KV LINE (LOOSE CREEK) TO BE TAKEN OOS 5/16 *
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2008-04-11 REFUELING OUTAGE
Diablo Canyon 1 100 *
Diablo Canyon 2 100 *
Fort Calhoun 0 2008-04-19 REFUELING OUTAGE. DEFUELED
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2008-03-28 REFUELING OUTAGE
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 *
San Onofre 3 80 HOLDING POWER FOR FUEL ECONOMY *
South Texas 1 100
South Texas 2 100
Waterford 3 0 2008-04-26 DEFUELED
Wolf Creek 1 48 HOLDING FOR TURBINE EHC TROUBLESHOOTING *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.