Skip to main content

Power Reactor Status Report for April 09, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100 *
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 60 INCREASING POWER *
Ginna 100
Hope Creek 1 100
Indian Point 2 0 2008-03-23 REFUELING OUTAGE *
Indian Point 3 100 *
Limerick 1 100
Limerick 2 100
Millstone 2 0 2008-04-05 REFUELING OUTAGE - MID-LOOP OPERATIONS IN EFFECT *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 0 2008-03-21 REFUELING OUTAGE
Oyster Creek 92 HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100 *
Salem 1 100 500 KV LINE OOS FOR MAINTENANCE
Salem 2 0 2008-03-11 DEFUELED 500 KV LINE OOS FOR MAINTENANCE
Seabrook 1 0 2008-03-31 REFUELING OUTAGE
Susquehanna 1 0 2008-03-03 REFUELING OUTAGE
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 100
Vermont Yankee 100 RELAY TESTING IN SWITCHYARD

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2008-03-18 REFUELING OUTAGE
Brunswick 1 0 2008-03-14 REFUELING OUTAGE
Brunswick 2 100 *
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 99 PROCEDURAL LIMIT *
Hatch 2 100
McGuire 1 100
McGuire 2 0 2008-03-01 REFUELING OUTAGE *
North Anna 1 100 *
North Anna 2 100 *
Oconee 1 73 HOLDING POWER UNTIL OUTAGE; 1A1 RCP SHUT DOWN
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 97 HOLDING POWER - ANTICIPATE RESTORING 2B CIRC WATER PUMP ON DAYSHIFT - 2A CCW HX OOS *
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 0 2008-03-30 REFUELING OUTAGE - DEFUELED *
Vogtle 1 0 2008-03-15 REFUELING OUTAGE; RAT 1A OOS 4/9/08 *
Vogtle 2 98 100% ELECTRICAL CAPABILITY. *
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 0 2008-03-23 REFUELING OUTAGE
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY
D.C. Cook 1 0 2008-03-25 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 99 100% ELECTRICAL CAPABILITY
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY *
Fermi 2 100
Kewaunee 0 2008-03-28 REFUELING OUTAGE
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 0 2008-04-03 PLANNED MAINTENANCE OUTAGE
Point Beach 1 100 NOUE ON 4/8 SEE EN #44126 *
Point Beach 2 0 2008-04-05 REFUELING OUTAGE; TRANSFORMER 2XO4 OOS; NOUE ON 4/8 SEE EN #44126 *
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2008-03-16 REFUELING OUTAGE - COOLED FOR REPAIRS *
Callaway 100 SWITCHYARD WORK ON BKR MDB41 *
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 2008-03-29 REFUELING OUTAGE - CORE RELOAD IN PROGRESS
Cooper 84 COASTDOWN TO REFUELING OUTAGE *
Diablo Canyon 1 100
Diablo Canyon 2 0 2008-02-03 REFUELING OUTAGE *
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2008-03-28 REFUELING OUTAGE
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 *
San Onofre 3 99 *
South Texas 1 0 2008-03-29 REFUELING OUTAGE
South Texas 2 100
Waterford 3 100 *
Wolf Creek 1 0 2008-03-17 REFUELING OUTAGE DEFUELED

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.