Skip to main content

Power Reactor Status Report for March 20, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100 OFFSITE LINE 5023 (500 KV) OOS
Indian Point 2 96 COASTDOWN TO REFUELING OUTAGE *
Indian Point 3 100 *
Limerick 1 1 INCREASING POWER *
Limerick 2 100
Millstone 2 100
Millstone 3 100 LINE 348 (345 KV) OOS UNTIL 3/21
Nine Mile Point 1 100
Nine Mile Point 2 100 WILL COMMENCE SHUTDOWN FOR REFUELING OUTAGE ON 3/21
Oyster Creek 93 HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 0 2008-03-11 DEFUELED
Seabrook 1 100
Susquehanna 1 0 2008-03-03 REFUELING OUTAGE
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2008-03-18 REFUELING OUTAGE
Brunswick 1 0 2008-03-14 REFUELING OUTAGE
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2008-03-01 ENTER MODE 1 ON 3/21 *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 19 INCREASING POWER *
Hatch 2 100
McGuire 1 100
McGuire 2 0 2008-03-01 DEFUELED
North Anna 1 100
North Anna 2 100
Oconee 1 73 1A1 RCP SHUT DOWN
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100 161 KV MOCCASIN LINE OOS THRU 3/21 - GRID RISK YELLOW DUE TO TVA GENERATING CAPACITY OUTAGES
Sequoyah 2 100 161 KV MOCCASIN LINE OOS THRU 3/21 - GRID RISK YELLOW DUE TO TVA GENERATING CAPACITY OUTAGES
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100 *
Turkey Point 4 100
Vogtle 1 0 2008-03-15 REFUELING OUTAGE
Vogtle 2 99 100% ELECTRICAL CAPABILITY *
Watts Bar 1 0 2008-02-10 REFUELING OUTAGE *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 99 COASTDOWN TO REFUELING OUTAGE *
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 98 100% ELECTRICAL CAPABILITY; LINE 1221 (345KV) OOS
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100 SHOAL LINE (120KV) OOS UNTIL 3/20 (1 OF 5)
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 95 STABLE FOLLOWING POWER SUPPRESSION TESTING *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 2008-03-16 REFUELING OUTAGE
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL OUTPUT
Quad Cities 2 0 2008-03-02 REFUELING OUTAGE *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2008-03-16 REFUELING OUTAGE *
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 99 INCREASING POWER *
Cooper 89 COASTDOWN TO REFUELING OUTAGE
Diablo Canyon 1 100 MORRO BAY-DIABLO 230 KV LINE OOS THRU 3/28 *
Diablo Canyon 2 0 2008-02-03 DEFUELED
Fort Calhoun 0 2008-03-15 TRIP SEE EN# 44066
Grand Gulf 1 65 HOLDING POWER WHILE TROUBLESHOOTING "B" RX FEEDPUMP TRIP. *
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 70 TROUBLESHOOT FEEDWATER HEATER FLOW ISSUE
San Onofre 2 99
San Onofre 3 100
South Texas 1 88 COASTDOWN TO REFUELING OUTAGE *
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 2008-03-17 WILL DEPRESSURIZE FOR REFUEL OUTAGE BEGINNING 3/20 *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.