Skip to main content

Power Reactor Status Report for March 02, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 82 REDUCED POWER FOR WATERBOX CLEANING
Beaver Valley 2 100
Calvert Cliffs 1 0 2008-02-22 REFUELING OUTAGE
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 0 2008-02-29 SCHEDULED REFUELING OUTAGE *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 92 TURBINE VALVE ISSUES AND FW HEATER OOS *
Peach Bottom 2 100 *
Peach Bottom 3 100 *
Pilgrim 1 100
Salem 1 100
Salem 2 90 COASTDOWN TO REFUELING OUTAGE *
Seabrook 1 100
Susquehanna 1 97 COASTDOWN TO REFUELING OUTAGE
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 500 KV UNION LINE OOS
Browns Ferry 2 100 500 KV UNION LINE OOS
Browns Ferry 3 98 500 KV UNION LINE OOS COASTDOWN TO REFUELING OUTAGE *
Brunswick 1 94 COASTDOWN TO REFUELING OUTAGE
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2008-03-01 SCHEDULED REPAIR TO RCP SEAL *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 0 2008-02-03 REFUELING OUTAGE
Hatch 2 100
McGuire 1 100
McGuire 2 0 2008-03-01 SCHEDULED REFUELING OUTAGE *
North Anna 1 100
North Anna 2 100
Oconee 1 73 1A RCP SHUT DOWN *
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 0 2008-02-26 PREPARING FOR STARTUP *
Turkey Point 4 100 *
Vogtle 1 100 TG VOLTAGE REGULATOR IN MANUAL
Vogtle 2 100
Watts Bar 1 0 2008-02-10 DEFUELED

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY - 345KV LINE 4545 WILL BE OOS FROM 0800 3/3 TO 1500 3/4.
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 97 100% ELECTRICAL CAPABILITY *
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 97 100% ELECTRICAL CAPABILITY.
Fermi 2 100 BROWNSTOWN-WAYNE 2 LINE (1 OF 3) OOS THRU 3/7
Kewaunee 100
La Salle 1 16 HOLDING POWER FOR TURBINE TESTING
La Salle 2 100
Monticello 100
Palisades 100 FRONT BUS WILL BE OOS FOR MAINTENANCE ON 3/3
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 2008-02-12 CORE RELOAD IN PROGRESS
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL OUTPUT
Quad Cities 2 85 COASTDOWN TO REFUELING OUTAGE *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 96 COASTDOWN TO REFUELING OUTAGE
Diablo Canyon 1 100
Diablo Canyon 2 0 2008-02-03 DEFUELED
Fort Calhoun 100
Grand Gulf 1 97 INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT *
Palo Verde 1 100 *
Palo Verde 2 99 HIGH RATE BLOWDOWNS IN PROGRESS *
Palo Verde 3 100 *
River Bend 1 2 COMMENCING PLANT STARTUP *
San Onofre 2 99
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.