Skip to main content

Power Reactor Status Report for February 28, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 82 REDUCED POWER FOR SCHEDULED MAINTENANCE
Beaver Valley 2 100
Calvert Cliffs 1 0 2008-02-22 REFUELING OUTAGE *
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 90 COASTDOWN TO REFUELING OUTAGE
Limerick 2 100
Millstone 2 100 *
Millstone 3 100 *
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 92 TURBINE VALVE ISSUES AND FW HEATER OOS
Peach Bottom 2 100 #3 STARTUP SOURCE WILL BE OOS THRU 3/1/08.
Peach Bottom 3 100 #3 STARTUP SOURCE WILL BE OOS THRU 3/1/08.
Pilgrim 1 100
Salem 1 100
Salem 2 93 COASTDOWN TO REFUELING OUTAGE *
Seabrook 1 100
Susquehanna 1 98 COASTDOWN TO REFUELING OUTAGE
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 500 KV UNION LINE OOS
Browns Ferry 2 100 500 KV UNION LINE OOS
Browns Ferry 3 100 500 KV UNION LINE OOS
Brunswick 1 95 COASTDOWN TO REFUELING OUTAGE
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 0 2008-02-03 REFUELING OUTAGE
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 0 2008-02-26 TRIP SEE EN #44009
Turkey Point 4 0 2008-02-26 TRIP SEE EN #44009; STARTUP PREPS IN PROGRESS - ANTICIPATE ENTERING MODE 2 ON 2/28 *
Vogtle 1 95 100% ELECTRICAL CAPABILITY - TG VOLTAGE REGULATOR IN MANUAL *
Vogtle 2 98 100% ELECTRICAL CAPABILITY
Watts Bar 1 0 2008-02-10 DEFUELED

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 97 100% ELECTRICAL CAPABILITY
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY.
Fermi 2 100 120KV SWAN CREEK LINE (1 0F 3) OOS FROM 0700 2/27 THRU 1600 2/28 - BROWNSTOWN-WAYNE 2 LINE (1 OF 3) OOS THRU 3/7 *
Kewaunee 100
La Salle 1 1 REACTOR STARTUP IN PROGRESS *
La Salle 2 100
Monticello 100
Palisades 100 FRONT BUS WILL BE OOS FOR MAINTENANCE ON 3/3
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 2008-02-12 DEFUELED
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL OUTPUT
Quad Cities 2 91 COASTDOWN TO REFUELING OUTAGE

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 96 COASTDOWN TO REFUELING OUTAGE *
Diablo Canyon 1 100 MORRO BAY 230KV LINE WILL BE OOS FROM 2/29 THRU 3/9 *
Diablo Canyon 2 0 2008-02-03 DEFUELED. MORRO BAY 230KV LINE WILL BE OOS FROM 2/29 THRU 3/9 *
Fort Calhoun 100
Grand Gulf 1 35 INCREASING POWER *
Palo Verde 1 100 MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1
Palo Verde 2 100 MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1
Palo Verde 3 100 MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1
River Bend 1 0 2008-01-06 REFUELING OUTAGE
San Onofre 2 99
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.