Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100 *
Ginna 100 *
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 98 COASTDOWN TO REFUELING OUTAGE *
Limerick 2 100
Millstone 2 100 *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 91 HOLDING POWER FOR TURBINE VALVE TESTING *
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 67 INCREASING POWER *
Susquehanna 1 100
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100 COASTDOWN TO REFUELING OUTAGE FEEDWATER TEMPERATURE REDUCTION TO MAINTAIN 100% POWER
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100 *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 90 COASTDOWN TO REFUELING OUTAGE CONDENSATE PUMP TRIP
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2008-01-29 REDUCED INVENTORY TO PERFORM MAINTENANCE ON RCPS
Sequoyah 1 100
Sequoyah 2 100
Summer 1 INCREASING POWER *
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 97 100% ELECTRICAL CAPABILITY
Vogtle 2 98 100% ELECTRICAL CAPABILITY
Watts Bar 1 100 TWO WATTS BAR HYDRO SWITCHYARD 161KV CONTINGENCY LINES OOS *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 21 LOWERING POWER TO TROUBLESHOOT 1C RCP *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 0 2008-01-11 REFUELING OUTAGE
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 4 INCREASING POWER *
Dresden 2 97 100% ELECTRICAL CAPABILITY
Dresden 3 97 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY.
Fermi 2 0 2008-01-31 SCRAM DUE TO LOSS OF RECIRC PUMPS - SEE EN# 43948 *
Kewaunee 100
La Salle 1 79 COASTDOWN TO REFUELING OUTAGE *
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 0 2008-01-16 FORCED OUTAGE - TRANSFORMER REPAIR IN PROGRESS
Point Beach 2 100
Prairie Island 1 94 COASTDOWN TO REFUELING OUTAGE *
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100 RECIRC PUMPS IN MANUAL
Comanche Peak 1 12 LOWERING POWER FOR SCHEDULED MAINTENANCE *
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100 230KV MORRO BAY-MIDWAY LINE OOS TIL MID MARCH
Diablo Canyon 2 94 COASTDOWN TO REFUELING OUTAGE - 230KV MORRO BAY-MIDWAY LINE OOS TIL MID MARCH *
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 98 LOWERED POWER FOR CONTROL VALVE TESTING *
Palo Verde 2 100 *
Palo Verde 3 100 *
River Bend 1 0 2008-01-06 DEFUELED FOR CHEMICAL CLEANING
San Onofre 2 98 ADMINISTRATIVE LIMIT BASED ON STEAM GENERATOR LIMITATIONS
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours