Power Reactor Status Report for November 24, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 99 CROSS FLOW DATA AQUISITION IN PROGRESS
Indian Point 2 100
Indian Point 3 100
Limerick 1 100 GENERATOR VOLTAGE REGULATOR IN MANUAL
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 95 MOISTURE SEPARATOR REHEATERS OOS
Oyster Creek 100 4 RECIRC LOOP OPERATION, 'C' RECIRC PUMP SEAL FAILURE. *
Peach Bottom 2 100 STARTUP SOURCE 343 OOS
Peach Bottom 3 100 STARTUP SOURCE 343 OOS
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100 POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY
Susquehanna 1 100
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE AND LIMESTONE INTERBANK TIE LINE OOS.
Browns Ferry 2 100 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE AND LIMESTONE INTERBANK TIE LINE OOS.
Browns Ferry 3 100 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE AND LIMESTONE INTERBANK TIE LINE OOS.
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2007-11-02 REFUELING OUTAGE
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2007-10-26 DEFUELED
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2007-09-30 DEFUELED
Sequoyah 1 99 SECONDARY PLANT MAINTENANCE *
Sequoyah 2 100
Summer 100
Surry 1 0 2007-10-20 REFUELING OUTAGE
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 97 100% ELECTRICAL CAPABILITY
Vogtle 2 98 100% ELECTRICAL CAPABILITY
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY - COASTDOWN TO REFUELING OUTAGE *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 24 POWER ASCENSION TESTING IN-PROGRESS *
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 100
La Salle 1 90 COASTDOWN TO REFUELING OUTAGE
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100 SERVICE TRANSFORMER 11 OOS BEGINNING 11/24 TIL 12/2 *
Palo Verde 1 0 2007-11-23 FORCED OUTAGE - TS REQUIRED SHUTDOWN DUE TO INOPERABLE AUTOMATIC LOAD SEQUENCER - SEE EVENT #43804 - RCS COOLDOWN WILL COMMENCE SHORTLY *
Palo Verde 2 100
Palo Verde 3 0 2007-09-29 DEFUELED
River Bend 1 80 HOLDING FOR SCHEDULED MAINTENANCE
San Onofre 2 97 S/G LIMITATIONS
San Onofre 3 99
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.