Power Reactor Status Report for November 06, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 0 2007-11-05 FEED PUMP MAINTENANCE *
Ginna 100
Hope Creek 1 0 2007-10-13 REFUELING OUTAGE
Indian Point 2 100 *
Indian Point 3 100 *
Limerick 1 100
Limerick 2 100
Millstone 2 100 SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES)
Millstone 3 100 SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES)
Nine Mile Point 1 100
Nine Mile Point 2 0 2007-11-03 MAINTENANCE OUTAGE, DRYWELL HEAD OFF *
Oyster Creek 100
Peach Bottom 2 100 STARTUP SOURCE 343 OOS FOR TEST
Peach Bottom 3 100 STARTUP SOURCE 343 OOS FOR TEST
Pilgrim 1 100 LINE 342 AT PARTIAL CAPACITY - IF OTHER 345KV LINE IS LOST ISO WILL REQUEST REDUCTION TO 400MWE
Salem 1 100
Salem 2 100
Seabrook 1 100 POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY
Susquehanna 1 100
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 0 2007-10-21 REFUELING OUTAGE *
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 2007-11-03 MAINTENANCE OUTAGE FOR NOBLE METALS - 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE, LIMESTONE INTERBANK TIE LINE OOS *
Browns Ferry 2 100 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE, LIMESTONE INTERBANK TIE LINE OOS *
Browns Ferry 3 100 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE, LIMESTONE INTERBANK TIE LINE OOS *
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0 2007-09-14 REFUELING OUTAGE *
Crystal River 3 0 2007-11-02 REFUELING OUTAGE
Farley 1 0 2007-09-28 REFUELING OUTAGE
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2007-10-26 REFUELING OUTAGE
Robinson 2 100 *
Saint Lucie 1 100
Saint Lucie 2 0 2007-09-30 DEFUELED
Sequoyah 1 0 2007-10-03 REFUELING OUTAGE- YELLOW GRID DUE TO OFFSITE ALIGNMENTS *
Sequoyah 2 100 YELLOW GRID DUE TO OFFSITE ALIGNMENTS *
Summer 100
Surry 1 0 2007-10-20 DEFUELED
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 97 100% ELECTRICAL CAPABILITY
Vogtle 2 98 100% ELECTRICAL CAPABILITY
Watts Bar 1 100 AUGUSTA - NEW SPRINT LINE OOS *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 85 HOLDING POWER FOR FUEL PRE-CONDITIONING *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 1 STARTUP IN PROGRESS - REACTOR CRITICAL < 1% POWER *
Davis-Besse 100
Dresden 2 0 2007-10-28 REFUELING OUTAGE
Dresden 3 99 100% ELECTRICAL CAPABILITY *
Duane Arnold 98 100% ELECTRICAL CAPABILITY - SWITCHYARD MAINTENANCE SCHEDULED FOR 11/6 WINDS PERMITTING *
Fermi 2 0 2007-09-29 REFUELING OUTAGE - OFFSITE 345KV BROWNSTOWN #3 LINE OOS *
Kewaunee 100
La Salle 1 95 COASTDOWN TO REFUELING OUTAGE
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100 345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK
Prairie Island 2 100 345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 2007-09-29 DEFUELED
River Bend 1 75 HOLDING POWER FOR SCHEDULED MAINTENANCE OUTAGE *
San Onofre 2 97 S/G LIMITATIONS
San Onofre 3 0 2007-10-09 MAINTENANCE OUTAGE *
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.