UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Beaver Valley 1 |
100 |
|
|
|
|
| Beaver Valley 2 |
100 |
|
|
|
|
| Calvert Cliffs 1 |
100 |
|
|
|
|
| Calvert Cliffs 2 |
100 |
|
|
|
|
| FitzPatrick |
0 |
2007-10-27 |
MANUAL SCRAM DUE TO LOWERING INTAKE LEVEL SEE EN#43752 |
|
|
| Ginna |
100 |
|
|
|
|
| Hope Creek 1 |
0 |
2007-10-13 |
REFUELING OUTAGE |
|
|
| Indian Point 2 |
100 |
|
|
|
|
| Indian Point 3 |
100 |
|
|
|
|
| Limerick 1 |
100 |
|
|
|
|
| Limerick 2 |
100 |
|
|
|
|
| Millstone 2 |
100 |
|
SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES) |
* |
|
| Millstone 3 |
100 |
|
SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES) |
* |
|
| Nine Mile Point 1 |
100 |
|
|
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
100 |
|
|
|
|
| Peach Bottom 2 |
100 |
|
|
|
|
| Peach Bottom 3 |
100 |
|
|
|
|
| Pilgrim 1 |
100 |
|
|
|
|
| Salem 1 |
100 |
|
|
|
|
| Salem 2 |
100 |
|
|
|
|
| Seabrook 1 |
100 |
|
307 LINE OOS (1 OF 3), POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY |
* |
|
| Susquehanna 1 |
18 |
|
COMPLETED REPAIRS TO MAIN TURBINE #2 CONTROL VALVE SERVO
PREPARING TO SYNCHRONIZE MAIN TURBINE TO THE GRID |
* |
|
| Susquehanna 2 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
| Three Mile Island 1 |
0 |
2007-10-21 |
REFUELING OUTAGE |
|
|
| Vermont Yankee |
100 |
|
|
|
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Browns Ferry 1 |
100 |
|
1 OF 7 (500 KV) TRANSMISSION LINES OOS FOR PLANNED MAINTENANCE |
|
|
| Browns Ferry 2 |
100 |
|
1 OF 7 (500 KV) TRANSMISSION LINES OOS FOR PLANNED MAINTENANCE |
* |
|
| Browns Ferry 3 |
100 |
|
1 OF 7 (500 KV) TRANSMISSION LINES OOS FOR PLANNED MAINTENANCE |
|
|
| Brunswick 1 |
100 |
|
|
|
|
| Brunswick 2 |
100 |
|
|
|
|
| Catawba 1 |
100 |
|
|
|
|
| Catawba 2 |
0 |
2007-09-14 |
REFUELING |
|
|
| Crystal River 3 |
65 |
|
CONDENSATE PUMP TRIP |
* |
|
| Farley 1 |
0 |
2007-09-28 |
DEFUELED |
|
|
| Farley 2 |
100 |
|
|
|
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
100 |
|
|
|
|
| Hatch 2 |
100 |
|
|
|
|
| McGuire 1 |
100 |
|
|
|
|
| McGuire 2 |
100 |
|
|
|
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
100 |
|
|
|
|
| Oconee 1 |
100 |
|
|
|
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
0 |
2007-10-26 |
REFUELING OUTAGE |
|
|
| Robinson 2 |
100 |
|
|
|
|
| Saint Lucie 1 |
100 |
|
|
|
|
| Saint Lucie 2 |
0 |
2007-09-30 |
DEFUELED |
|
|
| Sequoyah 1 |
0 |
2007-10-03 |
REFUELING OUTAGE |
|
|
| Sequoyah 2 |
100 |
|
|
* |
|
| Summer |
100 |
|
|
|
|
| Surry 1 |
0 |
2007-10-20 |
REFUELING OUTAGE |
|
|
| Surry 2 |
100 |
|
|
|
|
| Turkey Point 3 |
100 |
|
|
|
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
| Vogtle 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
| Watts Bar 1 |
100 |
|
|
|
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Braidwood 1 |
75 |
|
24 HOUR HOLD FOR FUEL CONDITIONING |
* |
|
| Braidwood 2 |
100 |
|
|
|
|
| Byron 1 |
0 |
2007-10-20 |
TS REQUIRED S/D - SEE EN #43735 |
* |
|
| Byron 2 |
0 |
2007-10-20 |
TS REQUIRED S/D - SEE EN #43735 |
* |
|
| Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
| D.C. Cook 1 |
100 |
|
|
|
|
| D.C. Cook 2 |
0 |
2007-09-14 |
REFUELING OUTAGE |
|
|
| Davis-Besse |
100 |
|
|
|
|
| Dresden 2 |
0 |
2007-10-28 |
REFUELING OUTAGE |
* |
|
| Dresden 3 |
99 |
|
100% ELECTRICAL CAPABILITY |
* |
|
| Duane Arnold |
99 |
|
100% ELECTRICAL CAPABILITY |
* |
|
| Fermi 2 |
0 |
2007-09-29 |
REFUELING OUTAGE |
|
|
| Kewaunee |
100 |
|
|
|
|
| La Salle 1 |
96 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| La Salle 2 |
100 |
|
|
|
|
| Monticello |
100 |
|
|
|
|
| Palisades |
65 |
|
MAIN FEED PUMP MAINTENANCE |
* |
|
| Perry 1 |
100 |
|
|
|
|
| Point Beach 1 |
100 |
|
|
|
|
| Point Beach 2 |
100 |
|
|
|
|
| Prairie Island 1 |
100 |
|
|
|
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
98 |
|
100% ELECTRICAL CAPABILITY |
* |
|
| Quad Cities 2 |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Arkansas Nuclear 1 |
100 |
|
|
|
|
| Arkansas Nuclear 2 |
100 |
|
|
|
|
| Callaway |
100 |
|
LOAD TAP CHANGER IN MANUAL |
|
|
| Columbia Generating Station |
100 |
|
|
|
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
100 |
|
|
|
|
| Cooper |
100 |
|
|
|
|
| Diablo Canyon 1 |
100 |
|
|
|
|
| Diablo Canyon 2 |
100 |
|
|
* |
|
| Fort Calhoun |
100 |
|
|
|
|
| Grand Gulf 1 |
100 |
|
|
|
|
| Palo Verde 1 |
0 |
2007-10-22 |
MAINTENANCE OUTAGE |
|
|
| Palo Verde 2 |
100 |
|
|
|
|
| Palo Verde 3 |
0 |
2007-09-29 |
DEFUELED |
|
|
| River Bend 1 |
75 |
|
EQUIPMENT RELIABILITY MAINTENANCE - CONDENSATE, FEEDWATER, AND FW HTR DRAIN PUMPS AND MOTORS |
|
|
| San Onofre 2 |
95 |
|
INCREASING POWER OVER NEXT WEEK - S/G LIMITATIONS |
|
|
| San Onofre 3 |
0 |
2007-10-09 |
MAINTENANCE OUTAGE |
|
|
| South Texas 1 |
100 |
|
|
|
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
100 |
|
|
|
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.