Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 90 HOLDING FOR FLUX MAP *
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 0 2007-10-27 MANUAL SCRAM DUE TO LOWERING INTAKE LEVEL SEE EN#43752 *
Ginna 100
Hope Creek 1 0 2007-10-13 REFUELING OUTAGE
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100 SWITCHYARD WORK (ACB 103) - RING BUS BREAKER
Salem 1 100
Salem 2 100
Seabrook 1 100 307 LINE OOS (1 OF 3), POWER REDUCTION THREAT DUE TO GRID WORK IN NEW ENGLAND UNTIL JANUARY
Susquehanna 1 0 2007-10-12 INTERMEDIATE RANGE 5 NEAR POAH *
Susquehanna 2 100 VOLTAGE REGULATOR IN MANUAL
Three Mile Island 1 0 2007-10-21 REFUELING OUTAGE RV DRAIN DOWN TO 80" *
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 1 OF 7 (500 KV) TRANSMISSION LINES OOS FOR PLANNED MAINTENANCE *
Browns Ferry 2 90 INCREASING POWER 1 OF 7 (500 KV) TRANSMISSION LINES OOS FOR PLANNED MAINTENANCE *
Browns Ferry 3 100 1 OF 7 (500 KV) TRANSMISSION LINES OOS FOR PLANNED MAINTENANCE
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0 2007-09-14 REFUELING
Crystal River 3 100
Farley 1 0 2007-09-28 DEFUELED
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100 *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2007-10-26 REFUELING OUTAGE *
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2007-09-30 DEFUELED
Sequoyah 1 0 2007-10-03 REFUELING OUTAGE
Sequoyah 2 100
Summer 100
Surry 1 0 2007-10-20 REFUELING OUTAGE *
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 97 100% ELECTRICAL CAPABILITY
Vogtle 2 98 100% ELECTRICAL CAPABILITY
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 68 INCREASING POWER *
Braidwood 2 100
Byron 1 0 2007-10-20 TS REQUIRED S/D - SEE EN #43735
Byron 2 0 2007-10-20 TS REQUIRED S/D - SEE EN #43735
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 0 2007-09-14 REFUELING OUTAGE
Davis-Besse 100
Dresden 2 98 COASTDOWN TO REFUELING OUTAGE *
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 0 2007-09-29 REFUELING OUTAGE
Kewaunee 100
La Salle 1 98 COASTDOWN TO REFUELING OUTAGE *
La Salle 2 100
Monticello 100
Palisades 60 MAIN FEED PUMP TESTING COMPLETE, WILL RAISE POWER SOON *
Perry 1 85 FEED PUMP TURBINE MAINTENANCE
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 98 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100 LOAD TAP CHANGER IN MANUAL
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 99 MODERATOR TEMPERATURE COEFFICIENT CALCULATION
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 0 2007-10-22 MAINTENANCE OUTAGE *
Palo Verde 2 100
Palo Verde 3 0 2007-09-29 DEFUELED
River Bend 1 100
San Onofre 2 94 INCREASING POWER OVER NEXT WEEK - S/G LIMITATIONS *
San Onofre 3 0 2007-10-09 MAINTENANCE OUTAGE
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.