Power Reactor Status Report for May 20, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100 POTENTIAL ISSUE WITH 115KV DUE TO NMP UNIT 1 SHUTDOWN AND FITZPATRICK EDG OUTAGE
Ginna 100
Hope Creek 1 100 SWITCHYARD WORK 5/20 *
Indian Point 2 100 MAINTENANCE ON FEEDER 95891 (1 OF 3)
Indian Point 3 100 MAINTENANCE ON FEEDER 95891 (1 OF 3)
Limerick 1 100 *
Limerick 2 100
Millstone 2 99 CIRCULATING WATER PUMP OOS
Millstone 3 32 INCREASING POWER *
Nine Mile Point 1 0 2007-05-17 MAINTENANCE OUTAGE - TURBINE OIL SYSTEM
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 95 TURBINE VALVE TESTING *
Seabrook 1 100 SWITCHYARD BREAKER 169 OOS UNTIL 23MAY07
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 0 2007-05-13 REFUELING OUTAGE, STARTUP XFORMER OOS - FEED THRU AUX XFORMER *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 MAINTENANCE OUTAGE
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 95 MAINTENANCE AND CONTROL PATTERN ADJUSTMENT *
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 1 HOLDING FOR MAIN FEED PUMP MAINTENANCE *
Harris 1 100 SWITHYARD WORK SCHEDULED FOR 5/23 *
Hatch 1 100
Hatch 2 100
McGuire 1 0 2007-03-10 REFUELING OUTAGE. STUCK CONTROL ROD (H8)
McGuire 2 100 *
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 0 2007-04-27 REFUELING OUTAGE
Oconee 3 100 *
Robinson 2 100
Saint Lucie 1 0 2007-04-01 REFUELING OUTAGE - HEATING UP *
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 99 100% ELECTRICAL CAPABILITY.
Vogtle 2 99 100% ELECTRICAL CAPABILITY
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 98 INCREASING POWER *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 59 ROD SEQUENCE EXCHANGE *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 41 CONDENSATE PUMP REPAIRS *
Dresden 2 99 100% ELECTRICAL CAPABILITY *
Dresden 3 99 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 100
La Salle 1 62 ROD SEQUENCE EXCHANGE AND SCRAM TIME TESTING *
La Salle 2 100
Monticello 100
Palisades 100 *
Perry 1 55 DIGITAL FEED WATER ISSUES *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 49 INCREASING POWER AFTER REPAIR OF TURBINE OIL LIFT SYSTEM *
Prairie Island 2 100
Quad Cities 1 0 2007-05-04 REFUELING OUTAGE - REACTOR HEAD INSTALLED *
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 0 2007-05-12 REFUELING OUTAGE
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2007-05-18 MANUAL SCRAM DUE TO CONTROL ROD HCU VALVE LEAK-SEE EN#43375
Diablo Canyon 1 0 2007-04-30 REFUELING OUTAGE *
Diablo Canyon 2 100 *
Fort Calhoun 100
Grand Gulf 1 0 2007-05-19 SCRAM DUE TO LOSS OF CONDENSER VACUUM SEE EN #43376 *
Palo Verde 1 0 2007-05-18 REFUELING OUTAGE *
Palo Verde 2 100 *
Palo Verde 3 99 MTC TESTING *
River Bend 1 100
San Onofre 2 98 TURBINE VALVE TESTING *
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.