Skip to main content

Power Reactor Status Report for May 08, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100 SWITCHYARD WORK *
Calvert Cliffs 2 100 SWITCHYARD WORK *
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100 MAINTENANCE ON FEEDER 95331
Indian Point 3 100 MAINTENANCE ON FEEDER 95331
Limerick 1 100
Limerick 2 100
Millstone 2 100 SWITCHYARD WORK *
Millstone 3 0 2007-04-07 REFUELING OUTAGE AND SWITCHYARD WORK *
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 0 2007-04-06 REFUELING OUTAGE
Salem 1 90 HOLDING POWER *
Salem 2 100
Seabrook 1 100 SWITCHYARD BREAKER 169 OOS *
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 96 COASTDOWN TO REFUELING OUTAGE *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 MAINTENANCE OUTAGE
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100 500 KV OFFSITE LINE OOS, 1 OF 6 LINES *
Farley 2 0 2007-04-09 REFUELING OUTAGE; 500 KV OFFSITE LINE OOS, 1 OF 6 LINES *
Harris 1 100
Hatch 1 93 ROD PATTERN ADJUSTMENTS *
Hatch 2 100
McGuire 1 0 2007-03-10 REFUELING OUTAGE
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 0 2007-04-27 DEFUELED
Oconee 3 100
Robinson 2 0 2007-04-06 REFUELING OUTAGE
Saint Lucie 1 0 2007-04-01 REFUELING OUTAGE
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100 *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 98 100% ELECTRICAL CAPABILITY.
Vogtle 2 95 INCREASING POWER *
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 82 INCREASING POWER *
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 4 INCREASING POWER *
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 100
La Salle 1 85 HOLDING POWER FOR EMERGENT REPAIR ON L.P. FW. HTR. *
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 0 2007-04-01 REFUELING OUTAGE
Point Beach 1 64 INCREASING POWER *
Point Beach 2 100
Prairie Island 1 55 LICENSEE PLANS TO COME OFF-LINE ON THUR. 10MAY07 TO REPAIR FW. PUMP *
Prairie Island 2 100
Quad Cities 1 0 2007-05-04 REFUELING OUTAGE *
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2007-05-01 REFUELING OUTAGE
Arkansas Nuclear 2 100
Callaway 0 2007-04-01 START-UP OPS SCHEDULED TO COMMENCE ON 8MAY07 *
Columbia Generating Station 90 COASTDOWN TO REFUELING OUTAGE
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 0 2007-04-30 REFUELING OUTAGE
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 82 INCREASING POWER *
San Onofre 2 99 100% ELECTRICAL CAPABILITY
San Onofre 3 100 *
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.