UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Beaver Valley 1 |
100 |
|
|
|
|
| Beaver Valley 2 |
100 |
|
|
|
|
| Calvert Cliffs 1 |
100 |
|
SWITCHYARD BREAKER #552-21 MAINTENANCE |
|
|
| Calvert Cliffs 2 |
100 |
|
SWITCHYARD BREAKER #552-21 MAINTENANCE |
|
|
| FitzPatrick |
100 |
|
|
|
|
| Ginna |
100 |
|
34.5 KV CKT 767 MAINTENANCE |
* |
|
| Hope Creek 1 |
100 |
|
|
|
|
| Indian Point 2 |
100 |
|
|
* |
|
| Indian Point 3 |
65 |
|
TROUBLESHOOTING MAIN GENERATOR VOLTAGE REGULATOR
PLANT SHUTDOWN EXPECTED TO BEGIN AT 08:00 |
* |
|
| Limerick 1 |
100 |
|
|
|
|
| Limerick 2 |
100 |
|
|
|
|
| Millstone 2 |
100 |
|
SYSTEM WIDE VOLTAGE REDUCTION TEST SOMETIME TODAY |
* |
|
| Millstone 3 |
0 |
2007-04-07 |
DEFUELED |
|
|
| Nine Mile Point 1 |
100 |
|
|
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
0 |
2007-04-28 |
SHUTDOWN FOR A & C RECIRC PUMP SEAL REPLACEMENT. |
|
|
| Peach Bottom 2 |
100 |
|
220 KV LINE 220-08 OOS |
|
|
| Peach Bottom 3 |
100 |
|
220 KV LINE 220-08 OOS |
|
|
| Pilgrim 1 |
0 |
2007-04-06 |
REFUELING OUTAGE |
|
|
| Salem 1 |
0 |
2007-04-30 |
REACTOR TRIP DUE TO GRASS INTRUSION INTO CIRCULATING WATER INTAKE STRUCTURE. SEE EN# 43329. |
|
|
| Salem 2 |
100 |
|
|
|
|
| Seabrook 1 |
100 |
|
|
|
|
| Susquehanna 1 |
100 |
|
|
|
|
| Susquehanna 2 |
100 |
|
|
|
|
| Three Mile Island 1 |
100 |
|
|
|
|
| Vermont Yankee |
97 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Browns Ferry 1 |
0 |
1985-03-03 |
MAINTENANCE OUTAGE
500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE |
* |
|
| Browns Ferry 2 |
100 |
|
500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE. |
* |
|
| Browns Ferry 3 |
100 |
|
500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE |
* |
|
| Brunswick 1 |
100 |
|
|
|
|
| Brunswick 2 |
100 |
|
|
|
|
| Catawba 1 |
100 |
|
|
|
|
| Catawba 2 |
100 |
|
|
|
|
| Crystal River 3 |
100 |
|
|
|
|
| Farley 1 |
100 |
|
|
|
|
| Farley 2 |
0 |
2007-04-09 |
RELOADING FUEL |
|
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
100 |
|
|
|
|
| Hatch 2 |
100 |
|
|
|
|
| McGuire 1 |
0 |
2007-03-10 |
REFUELING OUTAGE |
|
|
| McGuire 2 |
100 |
|
|
|
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
100 |
|
|
|
|
| Oconee 1 |
100 |
|
|
|
|
| Oconee 2 |
0 |
2007-04-27 |
REFUELING OUTAGE |
* |
|
| Oconee 3 |
100 |
|
|
|
|
| Robinson 2 |
0 |
2007-04-06 |
REFUELING OUTAGE |
* |
|
| Saint Lucie 1 |
0 |
2007-04-01 |
REFUELING OUTAGE |
* |
|
| Saint Lucie 2 |
100 |
|
|
|
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
100 |
|
|
|
|
| Summer |
93 |
|
HOLDING POWER FOR FW BOOSTER PUMP MAINT |
* |
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
100 |
|
|
|
|
| Turkey Point 3 |
100 |
|
|
|
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
98 |
|
100% ELECTRICAL CAPABILITY. |
|
|
| Vogtle 2 |
2 |
|
HOLDING POWER FOR SECONDARY WARMUP |
* |
|
| Watts Bar 1 |
100 |
|
|
|
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Braidwood 1 |
100 |
|
|
|
|
| Braidwood 2 |
100 |
|
|
|
|
| Byron 1 |
100 |
|
|
|
|
| Byron 2 |
0 |
2007-04-01 |
EXITING REFUELING OUTAGE |
* |
|
| Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
| D.C. Cook 1 |
100 |
|
|
|
|
| D.C. Cook 2 |
100 |
|
|
|
|
| Davis-Besse |
100 |
|
|
|
|
| Dresden 2 |
99 |
|
100% ELECTRICAL CAPABILITY |
* |
|
| Dresden 3 |
100 |
|
100% ELECTRICAL CAPABILITY |
* |
|
| Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
| Fermi 2 |
100 |
|
|
|
|
| Kewaunee |
100 |
|
|
|
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
100 |
|
|
|
|
| Monticello |
40 |
|
HOLDING FOR TESTING |
|
|
| Palisades |
100 |
|
|
|
|
| Perry 1 |
0 |
2007-04-01 |
REFUELING OUTAGE |
|
|
| Point Beach 1 |
0 |
2007-03-31 |
EXITING REFUELING OUTAGE |
* |
|
| Point Beach 2 |
100 |
|
|
|
|
| Prairie Island 1 |
56 |
|
FEED WATER PUMP REPAIRS
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
| Prairie Island 2 |
100 |
|
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY. |
|
|
| Quad Cities 1 |
77 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Arkansas Nuclear 1 |
0 |
2007-05-01 |
REFUELING OUTAGE |
* |
|
| Arkansas Nuclear 2 |
100 |
|
|
* |
|
| Callaway |
0 |
2007-04-01 |
EXITING REFUELING OUTAGE |
|
|
| Columbia Generating Station |
93 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
100 |
|
|
|
|
| Cooper |
100 |
|
|
|
|
| Diablo Canyon 1 |
0 |
2007-04-30 |
REFUELING OUTAGE |
* |
|
| Diablo Canyon 2 |
100 |
|
|
|
|
| Fort Calhoun |
100 |
|
|
|
|
| Grand Gulf 1 |
100 |
|
|
|
|
| Palo Verde 1 |
100 |
|
|
|
|
| Palo Verde 2 |
100 |
|
|
|
|
| Palo Verde 3 |
11 |
|
INCREASING POWER |
* |
|
| River Bend 1 |
100 |
|
|
|
|
| San Onofre 2 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
| San Onofre 3 |
100 |
|
|
|
|
| South Texas 1 |
100 |
|
|
|
|
| South Texas 2 |
100 |
|
|
* |
|
| Waterford 3 |
100 |
|
|
|
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.