Power Reactor Status Report for April 22, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 0 2007-04-06 HEAT UP IN PROGRESS *
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 0 2007-04-07 REFUELING OUTAGE DEFUELED
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 0 2007-04-06 REFUELING OUTAGE RV INSPECTIONS IN PROGRESS *
Salem 1 80 INCREASING POWER AFTER COMPLETION OF 16-HR HOLD *
Salem 2 100
Seabrook 1 100
Susquehanna 1 75 REDUCTION IN POWER FOR ROD SEQUENCE EXCHANGE *
Susquehanna 2 100 *
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 MAINTENANCE OUTAGE
Browns Ferry 2 74 INCREASING POWER POWER ASCENSION TESTING *
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 99 ROD PATTERN IMPROVEMENT AT 0900 THEN INCREASING POWER TO 100% *
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 0 2007-04-09 DEFUELED
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 2007-03-10 REFUELING OUTAGE ANTICIPATE ENTERING MODE 5 ON DAYSHIFT *
McGuire 2 100
North Anna 1 100
North Anna 2 5 HOLDING POWER FOR TURBINE VALVE TESTING *
Oconee 1 100
Oconee 2 91 COASTDOWN TO REFUELING OUTAGE
Oconee 3 100
Robinson 2 0 2007-04-06 DEFUELED
Saint Lucie 1 0 2007-04-01 DEFUELED
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 98 100% ELECTRICAL CAPABILITY.
Vogtle 2 25 INCREASING POWER TO 30% FOR CHEMISTRY HOLD *
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 0 2007-04-01 REFUELING OUTAGE
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 98 100% ELECTRICAL CAPABILITY
Dresden 3 98 100% ELECTRICAL CAPABILITY *
Duane Arnold 99 100% ELECTRICAL CAPABILITY *
Fermi 2 100
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 0 2007-03-13 REFUELING OUTAGE
Palisades 100 *
Perry 1 0 2007-04-01 REFUELING OUTAGE
Point Beach 1 0 2007-03-31 REFUELING OUTAGE *
Point Beach 2 100
Prairie Island 1 100 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY
Prairie Island 2 100 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY.
Quad Cities 1 82 COASTDOWN TO REFUELING OUTAGE
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 87 DOWNPOWER MANEUVER IN PROGRESS. UNIT SCHEDULED TO BE OFF-LINE AT 0800. *
Arkansas Nuclear 2 100
Callaway 0 2007-04-01 REFUELING OUTAGE
Columbia Generating Station 97 COASTDOWN TO REFUELING OUTAGE *
Comanche Peak 1 40 INCREASING POWER *
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100 *
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 2007-04-12 MAINTENANCE OUTAGE TO REPAIR TURBINE LUBE OIL PROBLEM
River Bend 1 100
San Onofre 2 99 *
San Onofre 3 100
South Texas 1 100
South Texas 2 0 2007-03-25 REFUELING OUTAGE *
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.