Skip to main content

Power Reactor Status Report for April 05, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 65 HOLDING POWER FOR MAIN FEED PUMP WORK *
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 81 INCREASING POWER *
Limerick 1 100
Limerick 2 44 INCREASING POWER *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 0 2007-03-16 REFUELING OUTAGE AND 345KV BKR OOS FOR MAINTENANCE
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 81 COASTDOWN TO REFUELING OUTAGE *
Salem 1 0 2007-03-27 DEFUELED *
Salem 2 100
Seabrook 1 100 369 KV NEWINGTON LINE OOS
Susquehanna 1 100
Susquehanna 2 0 2007-03-03 REFUELING OUTAGE
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 500 KV (MADISON) LINES OOS
Browns Ferry 2 0 2007-02-20 REFUELING OUTAGE 500 KV (MADISON) LINES OOS
Browns Ferry 3 100 500 KV (MADISON) LINES OOS
Brunswick 1 0 2007-04-01 PREPARING FOR STARTUP *
Brunswick 2 0 2007-03-02 REFUELING OUTAGE
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 90 INCREASING POWER AFTER COMPLETING UNPLANNED MAINTENANCE *
Farley 2 90 COASTDOWN TO REFUELING OUTAGE *
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 2007-03-10 DEFUELED
McGuire 2 100
North Anna 1 100
North Anna 2 0 2007-03-17 RELOAD IN PROGRESS *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 88 COASTDOWN TO REFUELING OUTAGE *
Saint Lucie 1 0 2007-04-01 REFUELING OUTAGE
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 98 100% ELECTRICAL CAPABILITY. *
Vogtle 2 0 2007-03-03 DEFUELED
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 0 2007-04-01 REFUELING OUTAGE
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 98 100% ELECTRICAL CAPABILITY
Dresden 3 99 100% ELECTRICAL CAPABILITY
Duane Arnold 5 NORMAL REACTOR STARTUP IN PROGRESS *
Fermi 2 100
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 0 2007-03-13 REFUELING OUTAGE
Palisades 100
Perry 1 0 2007-04-01 REFUELING OUTAGE *
Point Beach 1 0 2007-03-31 REFUELING OUTAGE
Point Beach 2 100
Prairie Island 1 100 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY
Prairie Island 2 100 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY
Quad Cities 1 85 COASTDOWN TO REFUELING OUTAGE
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 2007-04-01 REFUELING OUTAGE
Columbia Generating Station 96 COASTDOWN TO REFUELING OUTAGE *
Comanche Peak 1 0 2007-02-24 CORE RELOAD COMPLETED *
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100 500 KV GATES-#1 LINE OOS; 230 KV MORREL BAY MESA LINE OOS *
Diablo Canyon 2 57 CIRCULATING WATER TUNNEL SCRAPING 500 KV GATES-#1 LINE OOS; 230 KV MORREL BAY MESA LINE OOS *
Fort Calhoun 100
Grand Gulf 1 0 2007-03-18 REFUELING OUTAGE
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100 CONDENSER VACUUM RELATED ISSUES
San Onofre 2 99
San Onofre 3 100
South Texas 1 100
South Texas 2 0 2007-03-25 REFUELING OUTAGE
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.