Skip to main content

Power Reactor Status Report for February 04, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 94 INCREASING POWER *
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100 *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 98 COASTDOWN TO REFUELING OUTAGE
Nine Mile Point 2 83 'A' RX RECIRC PUMP UPPER SEAL CAVITY PRESSURE *
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 98 COASTDOWN TO REFUELING OUTAGE *
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 GENERATOR VOLTAGE REGULATOR IN MANUAL
Susquehanna 2 94 SERVICE WATER SIDE LEAK ON MAIN GENERATOR HYDROGEN COOLER *
Three Mile Island 1 100 COLD WEATHER ALERT STARTING 02/05 *
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 CORE LOADED CAVITY FLOODED 500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE
Browns Ferry 2 86 COASTDOWN TO REFUELING OUTAGE 500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE
Browns Ferry 3 100 500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE
Brunswick 1 100
Brunswick 2 99 COASTDOWN TO REFUELING OUTAGE
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 3 INCREASING POWER *
Hatch 2 96 COASTDOWN TO REFUELING OUTAGE
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100 *
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 95 HOLDING FOR FEEDWATER BOOSTER PUMP REPAIR
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 98 100% ELECTRICAL CAPABILITY
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100 COLD WEATHER ALERT UNTIL 02/05/07
Braidwood 2 100 COLD WEATHER ALERT UNTIL 02/05/07
Byron 1 100
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY OFFSITE POWER SOURCE MAINTENANCE (LATHAM LINE ) ON 02/03 -02/10
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 97 100% ELECTRICAL CAPABILITY *
Dresden 3 97 100% ELECTRICAL CAPABILITY
Duane Arnold 7 DECREASING FOR REFUELING OUTAGE CONSERVATIVE SYSTEM OPERATIONS ALERT 02/04 - 02/06 *
Fermi 2 100 *
Kewaunee 99 FEED FLOW MEASURING INSTRUMENT CALIBRATION ISSUE *
La Salle 1 100
La Salle 2 93 COASTDOWN TO REFUELING OUTAGE
Monticello 100 SYSTEM CONDITION YELLOW - CLEAR MAINTENANCE WITH DISPATCH
Palisades 100
Perry 1 100 *
Point Beach 1 100 SYSTEM ALERT DUE TO COLD WEATHER THRU 2/6 *
Point Beach 2 100 SYSTEM ALERT DUE TO COLD WEATHER THRU 2/6 *
Prairie Island 1 100 SYSTEM CONDITION YELLOW - CLEAR MAINTENANCE WITH DISPATCH
Prairie Island 2 100 SYSTEM CONDITION YELLOW - CLEAR MAINTENANCE WITH DISPATCH
Quad Cities 1 97 100% ELECTRICAL CAPABILITY COLD WEATHER ALERT
Quad Cities 2 96 100% ELECTRICAL CAPABILITY COLD WEATHER ALERT

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100 *
Cooper 90 INCREASING POWER FOLLOWING ROD SPEED ADJUSTMENT *
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 STEAM GENERATOR TUBE PLUGGING LIMITATION
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.