Skip to main content

Power Reactor Status Report for December 16, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 40 INCREASING POWER *
Calvert Cliffs 2 100
FitzPatrick 100 *
Ginna 100
Hope Creek 1 98 TURBINE VALVE TESTING *
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100 *
Peach Bottom 3 100 *
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 GENERATOR VOLTAGE REGULATOR IN MANUAL
Susquehanna 2 98 CONTROL ROD ADJUSTMENT *
Three Mile Island 1 99 *
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 REFUELING OUTAGE *
Browns Ferry 2 100 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE 1 OF 2 161 KV LINES OOS FOR PLANNED MAINTENANCE
Browns Ferry 3 100 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE 1 OF 2 161 KV LINES OOS FOR PLANNED MAINTENANCE
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 2006-11-10 DEFUELED
Catawba 2 100 CURRENTLY SUPPLYING AUX STEAM TO UNIT 1
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100 K-7 SOLAR ACTIVITY WARNING UNTIL 2200 HOURS ISSUED BY SYSTEM OPERATOR
North Anna 2 100 K-7 SOLAR ACTIVITY WARNING UNTIL 2200 HOURS ISSUED BY SYSTEM OPERATOR
Oconee 1 19 HOLDING POWER - TURBINE GENERATOR TESTING *
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2006-11-26 REFUELING OUTAGE *
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 98 *
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 97 100% ELECTRICAL CAPABILITY *
Dresden 3 98 100% ELECTRICAL CAPABILITY *
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 99
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 0 2006-12-13 FORCED OUTAGE - INSTRUMENT AIR REPAIRS COMPLETED *
Point Beach 1 100 *
Point Beach 2 100 *
Prairie Island 1 100
Prairie Island 2 55 INCREASING POWER AT 3%/HOUR *
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100 1 X 500 KV LINE (BREAKER 632) WILL BE TAKEN OOS FOR PLANNED MAINTENANCE *
Diablo Canyon 2 54 UNIT WILL RETURN TO FULL POWER ONCE CIRC WATER PUMP REPAIRS ARE COMPLETED NEXT WEEK *
Fort Calhoun 98 REDUCED POWER IN PREPARATION FOR MTC TESTING ON 12/17 *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 STEAM GENERATOR TUBE PLUGGING LIMITATION
San Onofre 3 20 PREPARING TO INCREASE POWER *
South Texas 1 100
South Texas 2 100
Waterford 3 0 2006-11-25 REFUELING OUTAGE *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.