Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100 ONE OF FOUR OFFSITE POWER SOURCES DOWN FOR MAINTENANCE
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100 OUTAGE ON 1 OF 2 SAFETY BUSES BEGINNING 12/3 ENDING 12/6
Peach Bottom 3 100 OUTAGE ON 1 OF 2 SAFETY BUSES BEGINNING 12/3 ENDING 12/6
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 GENERATOR VOLTAGE REGULATOR IN MANUAL *
Susquehanna 2 100
Three Mile Island 1 100 1 OF 4 OFFSITE LINES (LINE 1092) OOS UNTIL 12/8 *
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100 1 OF 2 161 KV LINES OOS AND 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE
Browns Ferry 3 100 1 OF 2 161 KV LINES OOS AND 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 2006-11-10 DEFUELED
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100 ONE DIESEL OOS FOR MAINTENANCE *
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 0 2006-10-06 REFUELING OUTAGE
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100 "A" TRAIN OFFSITE POWER (1 OF 2 TRAINS) OOS FOR PLANNED MAINTENANCE *
Saint Lucie 2 100 "A" TRAIN OFFSITE POWER (1 OF 2 TRAINS) OOS FOR PLANNED MAINTENANCE *
Sequoyah 1 100
Sequoyah 2 0 2006-11-26 DEFUELED
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 0 2006-10-30 LOW POWER PHYSICS TESTING *
Vogtle 1 98 100% ELECTRICAL CAPABILITY
Vogtle 2 100
Watts Bar 1 75 HOLDING POWER FOR TESTING

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 47 HOLDING POWER FOR GRID MAINTENANCE - 1 OF 3 345 KV LINES HAS A PROBLEM *
D.C. Cook 1 100 *
D.C. Cook 2 100 *
Davis-Besse 100
Dresden 2 97 100% ELECTRICAL CAPABILITY
Dresden 3 98 100% ELECTRICAL CAPABILITY
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 99 100% ELECTRICAL CAPABILITY
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 0 2006-11-14 REFUELING OUTAGE
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100 SWITCHYARD MAINTENANCE UNTIL 12/8
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 37 INCREASING POWER TO 50% AS REQUIRED FOR FUEL CONDITIONING AND TESTING OF NEW NSSS RP SYSTEM *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 75 REDUCED POWER FOR CONDENSER WATERBOX REPAIRS - TUBE PLUGGING *
San Onofre 2 99 STEAM GENERATOR TUBE PLUGGING LIMITATION *
San Onofre 3 0 2006-10-16 REFUELING OUTAGE
South Texas 1 100
South Texas 2 100
Waterford 3 0 2006-11-25 REFUELING OUTAGE
Wolf Creek 1 100 "A" EDG OUTAGE *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.