Power Reactor Status Report for November 04, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2006-10-01 REFUELING OUTAGE
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 2 STARTUP *
Ginna 63 INCREASING POWER *
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2006-10-06 REFUELING
Millstone 3 100
Nine Mile Point 1 96 ROD EXERCISES *
Nine Mile Point 2 100
Oyster Creek 0 2006-10-15 REFUELING OUTAGE
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 92 INCREASING POWER *
Seabrook 1 0 2006-09-30 REFUELING OUTAGE *
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 0 2006-11-02 TRIP - SEE EN #42957
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100 500 KV OFFSITE LINE OOS. 1 OF 7 OFFSITE LINES. *
Browns Ferry 3 100 500 KV OFFSITE LINE OOS. 1 OF 7 OFFSITE LINES. *
Brunswick 1 100 *
Brunswick 2 0 2006-11-01 REACTOR SCRAM - SEE EN# 42955
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 0 2006-09-16 REFUELING OUTAGE
North Anna 1 100
North Anna 2 100
Oconee 1 0 2006-10-06 REFUELING OUTAGE - DEFUELED
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100 YELLOW BUT STABLE GRID *
Sequoyah 2 100 YELLOW BUT STABLE GRID *
Summer 0 2006-10-13 DEFUELED
Surry 1 100
Surry 2 0 2006-10-07 CORE ON-LOAD IN PROGRESS
Turkey Point 3 100
Turkey Point 4 0 2006-10-30 REFUELING OUTAGE
Vogtle 1 98 *
Vogtle 2 100
Watts Bar 1 0 2006-09-10 DEFUELED - REPLACING ALL 4 STEAM GENERATORS

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 68 INCREASING POWER *
Byron 1 100 TRANSFORMER OUTAGE UNIT 1 *
Byron 2 100 TRANSFORMER OUTAGE UNIT 1 *
Clinton 96 100% ELECTRICAL CAPABILITY
D.C. Cook 1 0 2006-09-15 COMING OUT OF REFUELING OUTAGE *
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 90 SECONDARY SIDE FEEDWATER HEATER PROBLEM *
Dresden 3 0 2006-11-03 REFUELING OUTAGE *
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 99 HOLDING - COMPUTER CONVERSION PROBLEMS *
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 4 INCREASING POWER *
Perry 1 100
Point Beach 1 100
Point Beach 2 0 2006-10-15 COMING OUT OF REFUELING OUTAGE *
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100 *
Callaway 100
Columbia Generating Station 0 2006-10-31 REACTOR TRIP - SEE EN# 42950
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 0 2006-10-20 REFUELING OUTAGE. *
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 0 2006-09-09 DEFUELED *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2006-09-29 COMING OUT OF REFUELING OUTAGE *
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 STEAM GENERATOR TUBE PLUGGING LIMITATION
San Onofre 3 0 2006-10-16 DEFUELED *
South Texas 1 27 START-UP IN PROGRESS *
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 2006-10-06 COMING OUT OF REFUELING OUTAGE *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.