Power Reactor Status Report for October 29, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2006-10-01 REFUELING OUTAGE
Calvert Cliffs 1 100
Calvert Cliffs 2 100 *
FitzPatrick 0 2006-10-08 REFUELING OUTAGE
Ginna 0 2006-10-08 REFUELING OUTAGE *
Hope Creek 1 100
Indian Point 2 100 RING BUSS MAINTENANCE IN SWITCHYARD HIGH WINDS ADVISORY *
Indian Point 3 100 HIGH WINDS ADVISORY *
Limerick 1 100
Limerick 2 100
Millstone 2 0 2006-10-06 DEFUELED.
Millstone 3 64 DOWNPOWER FOR INTAKE SEAWEED *
Nine Mile Point 1 100 WEATHER ADVISORY *
Nine Mile Point 2 100 WEATHER ADVISORY *
Oyster Creek 0 2006-10-15 REFUELING OUTAGE *
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 0 2006-10-10 REFUELING OUTAGE
Seabrook 1 0 2006-09-30 REFUELING OUTAGE
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED 500KV LINE MAINTENANCE *
Browns Ferry 2 100 500KV LINE MAINTENANCE *
Browns Ferry 3 100 500KV LINE MAINTENANCE *
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 0 2006-09-16 REFUELING OUTAGE
North Anna 1 100
North Anna 2 100
Oconee 1 0 2006-10-06 REFUELING OUTAGE - DEFUELED
Oconee 2 100
Oconee 3 100
Robinson 2 100 *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 0 2006-10-13 DEFUELED SAFEGUARD BUSSES ON SAME OFFSITE POWER SOURCE
Surry 1 100
Surry 2 0 2006-10-07 DEFUELED
Turkey Point 3 100
Turkey Point 4 50 LOWERING POWER FOR REFUELING OUTAGE ON 10/30 *
Vogtle 1 0 2006-09-16 REFUELING OUTAGE
Vogtle 2 100
Watts Bar 1 0 2006-09-10 DEFUELED - REPLACING ALL 4 STEAM GENERATORS

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 0 2006-10-15 REFUELING OUTAGE
Byron 1 100
Byron 2 100
Clinton 95 100% ELECTRICAL CAPABILITY
D.C. Cook 1 0 2006-09-15 REFUELING OUTAGE
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 99 100% ELECTRICAL CAPABILITY *
Dresden 3 99 100% ELECTRICAL CAPABILITY *
Duane Arnold 98 100% ELECTRICAL CAPABILITY
Fermi 2 100 345 KV LINE WORK
Kewaunee 73 NI CALIBRATIONS IN PROGRESS *
La Salle 1 100
La Salle 2 100 *
Monticello 100
Palisades 100
Perry 1 100 *
Point Beach 1 100 TAKING DOWN ONE 345 KV TRANSMISSION LINE (1 OF 4)
Point Beach 2 0 2006-10-15 DEFUELED. TAKING DOWN ONE 345 KV TRANSMISSION LINE (1 OF 4)
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 18 HOLDING FOR POWER ASCENSION TESTING *
Callaway 100 YELLOW GRID STATUS *
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 80 HOLDING FOR NORMAL POWER ASCENSION TESTING *
Cooper 0 2006-10-20 REFUELING OUTAGE.
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 0 2006-09-09 DEFUELED
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2006-09-29 CORE RELOAD IN PROGRESS
Palo Verde 3 99 STEAM GENERATOR BLOWDOWNS *
River Bend 1 100 *
San Onofre 2 99 STEAM GENERATOR TUBE PLUGGING LIMITATION
San Onofre 3 0 2006-10-16 REFUELING OUTAGE
South Texas 1 0 2006-09-30 REFUELING OUTAGE
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 2006-10-06 REFUELING OUTAGE

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.