Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2006-10-01 REFUELING OUTAGE - DEFUELED
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 0 2006-10-08 REFUELING OUTAGE *
Ginna 0 2006-10-08 REFUELING OUTAGE *
Hope Creek 1 100 PEACH BOTTOM TRANSMISSION LINE 5014 (500 KV) OUTAGE. WILL USE DIFFERENT VAR CURVES FOR LOADING OF GENERATOR.
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 2006-10-06 REFUELING OUTAGE *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 90 COASTDOWN TO REFUELING OUTAGE
Peach Bottom 2 100 WILL OPEN ONE GENERATOR OUTPUT BREAKER TO SUPPORT WORK ON 5014 (500KV) SWITCHING TRANSMISSION LINE. *
Peach Bottom 3 100 *
Pilgrim 1 100 *
Salem 1 100 PEACH BOTTOM TRANSMISSION LINE 5014 (500 KV) OUTAGE. WILL USE DIFFERENT VAR CURVES FOR LOADING OF GENERATOR.
Salem 2 0 2006-10-10 REFUELING OUTAGE *
Seabrook 1 0 2006-09-30 REFUELING OUTAGE - DEFUELED *
Susquehanna 1 100
Susquehanna 2 0 2006-09-29 PLANNED RE-CHANNELING OUTAGE
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 0 2006-10-10 MAINTENANCE OUTAGE *
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 0 2006-09-16 REFUELING OUTAGE
North Anna 1 100
North Anna 2 100
Oconee 1 0 2006-10-06 REFUELING OUTAGE
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 80 PRE-OUTAGE MAINTENANCE IN PROGRESS
Surry 1 100
Surry 2 0 2006-10-07 WILL NOT RESTART BEFORE OUTAGE. *
Turkey Point 3 100
Turkey Point 4 85 INCREASING POWER *
Vogtle 1 0 2006-09-16 REFUELING OUTAGE
Vogtle 2 100
Watts Bar 1 0 2006-09-10 DEFUELED - REPLACING ALL 4 STEAM GENERATORS

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 90 COASTDOWN TO REFUELING OUTAGE *
Byron 1 0 2006-09-10 REFUELING OUTAGE
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY
D.C. Cook 1 0 2006-09-15 DEFUELED
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 99 100% ELECTRICAL CAPABILITY
Dresden 3 99 100% ELECTRICAL CAPABILITY *
Duane Arnold 96 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 0 2006-09-02 REFUELING OUTAGE
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2006-09-19 DEFUELED
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 2006-10-07 REFUELING OUTAGE
Cooper 94 COASTDOWN TO REFUELING OUTAGE. *
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 0 2006-09-09 DEFUELED
Grand Gulf 1 100
Palo Verde 1 0 2006-09-19 PREPARING FOR STARTUP
Palo Verde 2 0 2006-09-29 REFUELING OUTAGE
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 STEAM GENERATOR TUBE PLUGGING LIMITATION
San Onofre 3 94 COASTDOWN TO REFUELING OUTAGE *
South Texas 1 0 2006-09-30 DEFUELED
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 2006-10-06 REFUELING OUTAGE

* - Power Reactor Status Report change within past 24 hours