Skip to main content

Power Reactor Status Report for August 19, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 97 POWER UPRATE ACTIVITIES
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 97 COASTDOWN TO REFUELING OUTAGE *
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 0 2006-08-10 EMERGENT MAINTENANCE OUTAGE - STATOR COOLING LEAK REPAIR IN PROGRESS. *
Brunswick 2 100 *
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2006-08-18 MAINTENANCE OUTAGE - FEEDWATER LEAK REPAIR *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 87 VALVE TESTING AND ROD SEQUENCE EXCHANGE *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2006-08-18 TROUBLESHOOTING AND REPAIR OF THE CONTROL ROD DRIVE *
Robinson 2 100 *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100 *
Sequoyah 2 100 *
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100 8W90 BREAKER OPEN - SW BUS TO STARTUP TRANSFORMER *
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100 *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 96 100% ELECTRICAL CAPABILITY
D.C. Cook 1 97 COASTDOWN TO REFUELING OUTAGE *
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 99 100% ELECTRICAL CAPABILITY
Dresden 3 88 ROD ADJUSTMENT IN PROGRESS *
Duane Arnold 96 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 98 100% ELECTRICAL CAPABILITY
Quad Cities 2 97 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100 POSSIBLE HANDS OFF LATER TODAY *
Comanche Peak 2 100 POSSIBLE HANDS OFF LATER TODAY *
Cooper 97 INCREASING POWER AFTER COMPLETING A ROD ADJUSTMENT *
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 97 MTC TESTING SCHEDULED FOR SUNDAY *
Grand Gulf 1 100
Palo Verde 1 100 *
Palo Verde 2 99 STEAM GENERATOR HIGH RATE BLOWDOWNS IN PROGRESS *
Palo Verde 3 100
River Bend 1 100
San Onofre 2 99 LIMITED DUE TO SG TUBE PLUGGING LIMIT
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 96 INCREASING POWER *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.