Power Reactor Status Report for November 24, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 0 2004-10-10 DEFUELED
Indian Point 2 50 INCREASING POWER *
Indian Point 3 100
Limerick 1 99 REDUCED POWER WHILE EVALUATING FEEDWATER FLOW INSTRUMENTATION
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 88 INCREASING POWER *
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 19 HOLDING POWER FOR MAINTENANCE *
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 0 2004-11-23 AUTOMATIC REACTOR SCRAM. SEE EN#41219 *
Brunswick 1 100
Brunswick 2 96 100% ELECTRICAL CAPABILITY
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 99 100% ELECTRICAL CAPABILITY
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2004-10-08 DEFUELED
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 94 INCREASING POWER *
Sequoyah 2 100
Summer 100
Surry 1 0 2004-10-30 CORE RELOADED
Surry 2 100
Turkey Point 3 0 2004-09-26 REFUELING OUTAGE
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 65 MAINTENANCE HOLD FOR FEED PUMP REPAIR *
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 94 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 0 2004-11-22 SHUTDOWN TO REPAIR STEAM LEAK AND SMALL RCS LEAK AT PRESSURIZER MANWAY SEAL *
Davis-Besse 100
Dresden 2 0 2004-11-02 SHUTDOWN FOR MAIN TURBINE REPAIR. PLANNING TO INSPECT STEAM DRYER *
Dresden 3 0 2004-10-26 REFUELING OUTAGE
Duane Arnold 94 100% ELECTRICAL CAPABILITY
Fermi 2 0 2004-11-05 REFUELING OUTAGE
Kewaunee 0 2004-10-08 REFUELING OUTAGE
La Salle 1 100
La Salle 2 100 *
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 1 NORMAL STARTUP *
Prairie Island 1 45 HOLDING FOR STOP VALVE TESTING *
Prairie Island 2 100
Quad Cities 1 85 LIMITED IN POWER (STEAM DRYER MONITORING)
Quad Cities 2 85 LIMITED IN POWER (STEAM DRYER MONITORING)

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 2004-10-25 FUEL RELOAD IN PROGRESS
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 2004-10-01 PREPARING FOR STARTUP *
River Bend 1 55 HOLDING FOR LPRM CALS *
San Onofre 2 99 *
San Onofre 3 0 2004-09-27 DEFUELED
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.