Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 0 2004-10-17 REFUELING OUTAGE
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 2 STARTUP IN PROGRESS *
Ginna 100
Hope Creek 1 0 2004-10-10 SWITCHING FROM A MAINTENANCE OUTAGE TO A REFUELING OUTAGE
Indian Point 2 0 2004-10-22 REFUELING OUTAGE *
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 63 SUPRESSION TESTING FOR FUEL LEAK IDENTIFICATION *
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 66 MAINTENANCE FOR FEEDWATER LEVEL CONTROL VALVE AND CONDENSER AIR IN-LEAKAGE *
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 80 REDUCED POWER FOR SCHEDULED LEAK REPAIR OF A REACTOR FEEDWATER PUMP *
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 96 100% ELECTRICAL CAPABILITY
Catawba 1 100
Catawba 2 0 2004-09-11 REFUELING OUTAGE
Crystal River 3 100
Farley 1 0 2004-10-01 DEFUELED
Farley 2 100
Harris 1 0 2004-10-15 REFUELING OUTAGE
Hatch 1 100
Hatch 2 99 100% ELECTRICAL CAPABILITY
McGuire 1 0 2004-10-18 MSIV REPAIR
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 2004-10-08 DEFUELED
Robinson 2 99 *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 98 COASTDOWN TO REFUELING OUTAGE *
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 0 2004-09-26 DEFUELED
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 0 2004-10-04 LOW POWER PHYSICS TEST IN PROGRESS *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 94 100% ELECTRICAL CAPABILITY *
D.C. Cook 1 100
D.C. Cook 2 0 2004-10-01 REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS *
Davis-Besse 89 TURBINE VALVE TESTING *
Dresden 2 98 100% ELECTRICAL CAPABILITY
Dresden 3 99 100% ELECTRICAL CAPABILITY
Duane Arnold 94 100% ELECTRICAL CAPABILITY *
Fermi 2 94 INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT *
Kewaunee 0 2004-10-08 REFUELING OUTAGE - DEFUELED
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 0 2004-09-19 REFUELING OUTAGE
Perry 1 99 *
Point Beach 1 100
Point Beach 2 64 HOLDING POWER FOR TRANSMISSION LINE OUTAGE. *
Prairie Island 1 0 2004-09-10 DEFUELED
Prairie Island 2 100
Quad Cities 1 85 LIMITED IN POWER (STEAM DRYER MONITORING)
Quad Cities 2 85 LIMITED IN POWER (STEAM DRYER MONITORING)

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100 *
Comanche Peak 2 100
Cooper 0 2004-10-19 FORCED MAINTENANCE OUTAGE DUE TO TURBINE VIBRATION PROBLEM
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100 *
Palo Verde 3 0 2004-10-01 REFUELING OUTAGE - DEFUELED
River Bend 1 0 2004-10-21 REFUELING OUTAGE
San Onofre 2 100
San Onofre 3 0 2004-09-27 REFUELING OUTAGE - DEFUELED
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.