Skip to main content

Power Reactor Status Report for June 19, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100 *
Nine Mile Point 2 100 *
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 19 HOLDING POWER WITH TURBINE OFFLINE FOR VALVE ADJUSTMENTS - REPLACING DIGITAL EHC CIRCUIT CARD *
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 0 2004-06-18 FORCED OUTAGE - UE DECLARED DUE TO MAIN TRANSFORMER FIRE - SEE EVENT #40827 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 53 HOLDING FOR SCHEDULED DOWN POWER *
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 87 HOLDING POWER DUE TO OIL LEAK ON CONDENSATE PUMP 'B' *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 99 INCREASING POWER *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 83 INCREASING POWER *
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 95 100% GENERATOR CAPACITY
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 95 PREPARING FOR TESTING *
Dresden 2 98 100% ELECTRICAL CAPACITY
Dresden 3 100 *
Duane Arnold 94 100% ELECTRICAL CAPABILITY
Fermi 2 100
Kewaunee 100
La Salle 1 68 PLANNED LOAD REDUCTION *
La Salle 2 100
Monticello 0 2004-06-18 PLANNED MAINTENANCE *
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 85 LIMITED IN POWER (STEAM DRYER MONITORING)
Quad Cities 2 85 LIMITED IN POWER (STEAM DRYER MONITORING)

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2004-06-11 FORCED OUTAGE FOR LOW PRESSURE TURBINE REPAIR *
Arkansas Nuclear 2 100
Callaway 92 HOLDING FOR CHEMISTRY *
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 55 GOING TO 50% POWER FOR PLANNED MAINTENANCE. *
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 19 TESTING IN PROGRESS *
Palo Verde 2 1 STARTUP IN PROGRESS *
Palo Verde 3 0 2004-06-14 PLANT TRIP - SEE EN # 40816
River Bend 1 100
San Onofre 2 99 *
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.