Skip to main content

Power Reactor Status Report for September 28, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100 *
Ginna 100
Hope Creek 1 76 REDUCING POWER TO 50% FOR MAINTENANCE *
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 0 2002-09-06 REFUELING OUTAGE - CORE RELOADED
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 98 COASTDOWN TO REFUELING OUTAGE
Peach Bottom 2 0 2002-09-10 REFUELING OUTAGE
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 94 COASTDOWN TO REFUELING OUTAGE *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 90 COASTDOWN TO REFUELING OUTAGE *
Browns Ferry 3 100
Brunswick 1 0 2002-09-21 RECOVERING FROM REFUELING OUTAGE *
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 0 2002-09-13 REFUELING OUTAGE - DEFUELED
Harris 1 100
Hatch 1 71 POWER REDUCTION FOR CONTROL ROD SEQUENCE EXCHANGE *
Hatch 2 100
McGuire 1 0 2002-09-13 REFUELING OUTAGE
McGuire 2 100
North Anna 1 100 UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT.
North Anna 2 0 2002-09-07 UE DECLARED DUE TO LAKE LEVEL BELOW 246.0 FT - CURRENT LAKE LEVEL IS 245.4 FT REFUELING OUTAGE - DEFUELED
Oconee 1 100
Oconee 2 99 COASTDOWN TO REFUELING OUTAGE *
Oconee 3 100
Robinson 2 100
Saint Lucie 1 53 POWER REDUCTION TO 45% FOR PRE-OUTAGE WORK *
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 96 COASTDOWN TO REFUELING OUTAGE
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 0 2002-09-16 REFUELING OUTAGE
Clinton 93 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 100 *
Davis-Besse 0 2002-02-15 REFUELING OUTAGE - DEFUELED
Dresden 2 96 100% ELECTRICAL CAPABILITY *
Dresden 3 89 COASTDOWN TO REFUELING OUTAGE
Duane Arnold 94 100% ELECTRICAL CAPABILITY
Fermi 2 100 *
Kewaunee 100
La Salle 1 98 POWER REDUCTION FOR ROD PATTERN ADJUSTMENTS *
La Salle 2 98 POWER REDUCTION FOR ROD PATTERN ADJUSTMENTS *
Monticello 100
Palisades 30 POWER REDUCTION TO 25% FOR MAINTENANCE *
Perry 1 0 2002-09-21 FORCED OUTAGE
Point Beach 1 0 2002-09-13 REFUELING OUTAGE *
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 75 POWER REDUCTION TO 75% FOR MAINTENANCE *
Quad Cities 2 97 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 78 COASTDOWN TO REFUELING OUTAGE *
Arkansas Nuclear 2 100
Callaway 96 RAISING POWER FOLLOWING REDUCTION FOR MAINTENANCE *
Columbia Generating Station 100
Comanche Peak 1 0 2002-09-27 SHUTDOWN FOR MAINTENANCE *
Comanche Peak 2 100 *
Cooper 100
Diablo Canyon 1 98 LIMITED DUE TO HIGH TURBINE GENERATOR VIBRATION
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 0 2002-09-13 REFUELING OUTAGE
Palo Verde 1 0 2002-09-27 SHUTDOWN FOR REFUELING OUTAGE *
Palo Verde 2 98 TEMPERATURE LIMITED *
Palo Verde 3 99 TEMPERATURE LIMITED *
River Bend 1 100
San Onofre 2 100
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.