Skip to main content

Power Reactor Status Report for May 19, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 0 2002-02-15 REFUELING OUTAGE - REFUELED
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 20 HOLDING POWER AT THIS LEVEL WITH THE UNIT OFF LINE AS PART OF A MAINTENANCE OUTAGE TO REPAIR A TURBINE TRIP SOLENOID - PREPARING TO PLACE THE UNIT ON LINE *
Indian Point 2 100
Indian Point 3 100
Limerick 1 0 2002-05-19 AUTOMATIC REACTOR SCRAM FROM 94% POWER DUE TO A TURBINE TRIP FOR UNKNOWN REASONS (Refer to event #38927) *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 95 INCREASING POWER/PRECONDITIONING FOR 100% POWER AFTER EXITING A MAINTENANCE OUTAGE *
Nine Mile Point 2 100
Oyster Creek 88 INCREASING POWER AFTER DECREASING TO 65% POWER TO PERFORM HOTWELL MAINTENANCE *
Peach Bottom 2 100
Peach Bottom 3 100 *
Pilgrim 1 100
Salem 1 100
Salem 2 74 INCREASING POWER AFTER EXITING A REFUELING OUTAGE *
Seabrook 1 0 2002-05-04 REFUELING OUTAGE - REFUELED - REACTOR VESSEL HEAD TENSIONING IN PROGRESS *
Susquehanna 1 98
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 0 2002-05-11 MID-CYCLE MAINTENANCE OUTAGE - FUEL MOVES COMPLETE - REACTOR VESSEL HEAD REMOVED *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 60 INCREASING POWER AFTER EXITING A REFUELING OUTAGE *
Catawba 2 100
Crystal River 3 17 MAINTENANCE OUTAGE - PREPARING TO PLACE THE UNIT ON LINE *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 61 HOLDING POWER AT THIS LEVEL TO PERFORM WATERBOX REPAIRS *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 2002-04-14 REFUELING OUTAGE - MANUAL REACTOR TRIP FROM MODE 2 (Startup) DUE TO A CONTROL ROD SYSTEM URGENT FAILURE ALARM DURING LOW POWER PHYSICS TESTING ON 05/19/02 - POSSIBLY DUE TO A BLOWN FUSE IN THE ROD CONTROL CABINET (Refer to event #38928) *
Summer 0 2002-04-19 REFUELING OUTAGE - REFUELED *
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100 *
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 25 DECREASING POWER TO 20% TO PERFORM FEEDWATER REGULATING VALVE REPAIRS *
Byron 2 100 MEASURED STEAM GENERATOR TUBE LEAKAGE = 30 GPD *
Clinton 92 INCREASING POWER - PERFORMING EXTENDED POWER UPRATE TESTING *
D.C. Cook 1 0 2002-05-04 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 100
Davis-Besse 0 2002-02-15 REFUELING OUTAGE - FUEL SHUFFLE COMPLETE
Dresden 2 96 100% ELECTRICAL CAPABILITY
Dresden 3 83 HOLDING POWER AT THIS LEVEL TO PERFORM A FEEDWATER PUMP SWAP *
Duane Arnold 23 DECREASING POWER TO PERFORM CONDENSER TUBE LEAK REPAIRS AS PART OF A MAINTENANCE OUTAGE - PLAN TO GO TO CONDITION 4 *
Fermi 2 100 *
Kewaunee 100
La Salle 1 0 2002-05-18 MAINTENANCE OUTAGE - REACTOR VESSEL HEAD DETENSIONING IN PROGRESS *
La Salle 2 100
Monticello 100
Palisades 55 INCREASING POWER AFTER DECREASING TO LESS THAN 25% POWER TO ADD OIL TO A PRIMARY COOLANT PUMP *
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 88 INCREASING POWER AFTER DECREASING TO 65% POWER TO PERFORM A ROD SHUFFLE *
Quad Cities 2 96 100% ELECTRICAL POWER

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100 *
Comanche Peak 2 100
Cooper 0 2002-05-14 MAINTENANCE OUTAGE *
Diablo Canyon 1 0 2002-04-28 REFUELING OUTAGE - REFUELED
Diablo Canyon 2 100
Fort Calhoun 0 2002-05-03 REFUELING OUTAGE - DEFUELED
Grand Gulf 1 100
Palo Verde 1 99
Palo Verde 2 98 *
Palo Verde 3 99
River Bend 1 100 *
San Onofre 2 97 COASTDOWN TO REFUELING OUTAGE
San Onofre 3 100
South Texas 1 100
South Texas 2 100 *
Waterford 3 94 DECREASING POWER TO 90% TO PERFORM TURBINE VALVE TESTING *
Wolf Creek 1 0 2002-05-13 MAINTENANCE OUTAGE - PREPARING FOR REACTOR STARTUP *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.